Tinker AFB MACBOA WWYK250172 Replace Walls of Iszard Pool

SOL #: FA813726R0016Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Repair Or Alteration Of Recreational Buildings (Z2FB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 12, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
Jun 15, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for WWYK250172 – Replace Walls of Iszard Pool House at Tinker Air Force Base, Oklahoma. This Total Small Business Set-Aside opportunity, valued between $500,000 and $1,000,000, is exclusively for Tinker AFB - MAC BOA Holders. A mandatory initial site visit was held on March 25, 2026, and attendance was required for eligibility. Proposals are due by June 15, 2026, at 03:00 PM local time.

Scope of Work

This project involves furnishing all materials, labor, and equipment to replace CMU fence walls, the roof, and electrical systems & components, as well as repairing the pool house structure at Building B5730. Key tasks include:

  • Demolition of existing masonry, wood fences, and roof system.
  • Installation of new 8-foot metal panel fences, utility gates, and concrete sidewalks.
  • Structural work, including footing details, wall bracing, and CMU control joints.
  • Installation of a new PVC roof system with insulation, flashing, and drainage.
  • Upgrade of electrical systems, including new lighting, panelboards, and receptacles.
  • Performing a site investigation to verify existing conditions and providing all necessary logistical, architectural, and structural work elements for a complete, fully operating system.

Contract Details

  • Contract Type: Firm Fixed Price Solicitation (FA813726R0016).
  • Estimated Value: $500,000 to $1,000,000.
  • Period of Performance: Begin within 10 calendar days and complete within 180 calendar days after Notice to Proceed (NTP).
  • Bonds: Performance and Payment Bonds are required.
  • Funding: Obligation is contingent upon the availability of appropriated funds.
  • Place of Performance: Tinker Air Force Base, B5730, Oklahoma.

Eligibility & Submission

  • Eligibility: Restricted to Tinker AFB - MAC BOA Holders ONLY. Offerors must have attended the initial site visit on March 25, 2026, to be considered eligible.
  • Proposal Due Date: June 15, 2026, at 03:00 PM local time.
  • Offer Validity: Proposals must be valid for at least 120 calendar days.
  • Document Access: Project-specific documents are attached. For access difficulties, email Contracting Points of Contact for a DoD Safe transmission (Prime Contractor emails only).
  • Key Personnel: Resumes for Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent are required within five (5) calendar days after NTP.

Evaluation & Special Requirements

  • Evaluation: Instructions to Offerors and Evaluation Factors for Award are detailed in Sections L and M of the solicitation.
  • Wage Determination: Compliance with General Decision Number OK20260049 for building construction in Oklahoma County is mandatory.
  • Submittals: A comprehensive Submittal Register (ATT10) outlines all required documentation, including a baseline construction schedule within 10 days of NTP. Anticipated turnaround time for submittals is approximately 10 working days.
  • Utilities: Contractors are responsible for identifying and protecting active utilities; hydro-excavation is preferred.
  • Environmental: Asbestos-containing materials (ACM) have been identified in roofing sealant.

People

Points of Contact

Tamra TorresPRIMARY
Nicholas ApplebySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: May 11, 2026
Version 2
Solicitation
Posted: Apr 27, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 12, 2026
View