Trailer Pad/Housing Unit Improvements on the Kaibab National Forest in Northern AZ

SOL #: 127EAX26Q0017Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 7
Albuquerque, NM, 871023498, United States

Place of Performance

Flagstaff, AZ

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 22, 2026
3
Submission Deadline
May 28, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for Trailer Pad/Housing Unit Improvements on the Kaibab National Forest in Northern Arizona. This Total Small Business Set-Aside opportunity involves rehabilitation and upgrades to RV camping pads and associated utilities at multiple work centers. Quotes are due May 28, 2026, at 12:00 PM Mountain Time.

Scope of Work

This project focuses on improving on-site housing for firefighters and staff. The base scope includes the rehabilitation of eleven (11) RV camping pads: six (6) at Tanglefoot Work Center and five (5) at Tusayan Ranger Station. This involves clearing, subgrade preparation, new gravel placement, replacement of water and sewer connections/lines, and electrical component replacement on existing pedestals.

Optional work items include the rehabilitation of an additional thirteen (13) RV pads (eight at Jacob Lake Work Center and five at Big Springs Work Center), subsurface utility locating, television inspection and flow testing of septic systems, replacement of septic tanks and leach fields, installation of propane lines and connections for twenty-four (24) RV pads, and additional water and sewer line replacement. All work must comply with Coconino County and applicable national/state construction codes.

Contract Details

  • Contract Type: Anticipated Firm-Fixed Price.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (NTP), with the entire project ready for use no later than 220 calendar days after NTP, including final cleanup.
  • Bond Requirements: A Bid Bond is required. Performance and Payment Bonds are required within 10 days after NTP if awarded.
  • Warranty: One (1) year after contract completion and acceptance.
  • Set-Aside: Total Small Business Set-Aside (NAICS 237110, $45.0M size standard).

Submission & Evaluation

  • Quote Packages Due: May 28, 2026, 12:00 PM Mountain Time.
  • Submission Method: Email to melissa.heckenlaible@usda.gov.
  • Required Submittals: Completed Schedule of Items (including options), a list of at least three (3) similar past projects, and relevant technical experience. Post-award submittals include a construction schedule, manufacturer's literature, and As-Built Drawings.
  • Evaluation Criteria: Quotes will be evaluated based on Technical Approach, Price, and Past Performance. Award will be made to the offeror representing the best value, prioritizing the highest technically rated offeror whose price is fair and reasonable and whose past performance is acceptable or neutral. Tradeoffs will not be conducted.
  • Quote Validity: Must be valid for 90 calendar days.

Important Notes

  • Amendment 0001 incorporates RFI questions/responses and additional FAR clauses (52.223-1, 52.223-2). Contractors must acknowledge this amendment with their pricing package.
  • Site Visits: Two organized site visits were scheduled for May 12-13, 2026 (RSVP required).
  • Wage Rates: Construction Wage Rates Apply (refer to Attachment 6: Wage Determination).
  • Fire Plan: Compliance with the "2025 INDUSTRIAL FIRE PRECAUTIONS PLAN GUIDELINES FOR AUTHORIZED USERS" (Attachment 5) is mandatory for all work on Kaibab National Forest Lands.
  • Schedule Restrictions: Work at Tanglefoot WC and Jacob Lake WC is restricted between April 15 – October 31, requiring a minimum of 4 RV pads to remain operational.

People

Points of Contact

Melissa HeckenlaiblePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 22, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Trailer Pad/Housing Unit Improvements on the Kaibab National Forest in Northern AZ | GovScope