Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)

SOL #: W9128F26RA017Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST OMAHA
OMAHA, NE, 68102-4901, United States

Place of Performance

Place of performance not available

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 4, 2026
2
Last Updated
Apr 2, 2026
3
Action Date
Apr 17, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, U.S. Army Corps of Engineers (USACE) Omaha District, has issued a Special Notice regarding an upcoming Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC). This MATOC will be for the Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming. The purpose of this notice is to provide information about this significant construction acquisition. Responses or inquiries related to this notice are due by April 17, 2026.

Scope of Work

The planned MATOC will encompass construction services for the Ground Based Strategic Deterrent (GBSD) Utility Corridor. This involves both Design-Build and Design-Bid-Build approaches, indicating a broad range of construction and design capabilities will be required. The specific details of the work will be outlined in future solicitations under this MATOC.

Contract & Timeline

  • Type: Special Notice (Pre-Solicitation for a Two Phase DB/DBB MATOC)
  • Product Service Code: Y1NZ (Construction Of Other Utilities)
  • Set-Aside: None specified
  • Response Due: April 17, 2026, 7:00 PM ET
  • Published: April 2, 2026

Additional Notes

This notice includes a "Consolidation Memorandum" as an attachment, which should be reviewed for further details. Interested parties are also directed to a previously issued Pre-Solicitation Notice at the provided SAM.gov link: https://sam.gov/workspace/contract/opp/abc5e492f8964aa88de2590e291bbf7f/view. The notice also references several documents related to the PIEE Solicitation Module, which may be relevant for future engagement with this acquisition. For questions, contact Brandon Landis at brandon.p.landis@usace.army.mil or 402-995-2056.

People

Points of Contact

Files

Files

View
View
View
View
View
View
View
View

Versions

Version 4Viewing
Special Notice
Posted: Apr 2, 2026
Version 3
Pre-Solicitation
Posted: Mar 28, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 6, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 4, 2026
View
Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY) | GovScope