USCG Base Charleston - Boiler Replacement

SOL #: 70Z036-P2600-00018Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE CHARLESTON
N CHARLESTON, SC, 29405, United States

Place of Performance

North Charleston, SC

NAICS

Power Boiler and Heat Exchanger Manufacturing (332410)

PSC

Mechanical Presses, Power Driven (3443)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 17, 2026
2
Last Updated
Apr 2, 2026
3
Submission Deadline
Apr 8, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Coast Guard (USCG) Base Charleston is soliciting proposals for the replacement of the hydronic heating boiler in the Industrial Building at 196 Tradd St, Charleston, SC 29401. This is a 100% Total Small Business Set-Aside opportunity. The contract will be a Firm Fixed-Price Purchase Order, awarded based on Lowest Price Technically Acceptable (LPTA) evaluation. Quotes are due by April 8th, 2026, at 11:00 AM EST.

Scope of Work

The contractor will provide all labor, materials, and equipment to replace the existing hydronic heating boiler. Key tasks include:

  • Demolition and removal of the existing boiler, including flue connections and piping.
  • Installation of one (1) Floor-Mount High-Efficiency Commercial Water Boiler (725,000 BTU/hr, Natural Gas, Condensing Boiler) with specific features like a 10:1 turndown ratio and variable flow.
  • Connection to existing domestic water, gas, and hydronic piping systems, including new isolation valves, pressure relief valves, and backflow prevention devices.
  • Installation of new exhaust flue, condensate drainage systems (with neutralizer kits), and pipe insulation.
  • Start-up, commissioning, testing, and basic owner/operator training.
  • Incidental work items necessary for project completion, such as removal/replacement of smoke detectors, lights, and sprinkler heads.
  • Closeout documentation, including an electronic list of materials and line drawings of new equipment.

Contract Details

  • Contract Type: Firm Fixed-Price Purchase Order
  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 332410 (Size Standard: $19.0M)
  • Evaluation: Lowest Price Technically Acceptable (LPTA)
  • Performance Period: 60 calendar days from notice to proceed.
  • Wage Rates: Department of Labor Wage Rates for Construction #SC20260059 are applicable.

Key Requirements & Instructions

  • Mandatory Site Visit: All bidders are REQUIRED to visit the site to verify work details and existing conditions. Failure to conduct a site visit will result in disqualification. Site visits can be arranged between 8:00 AM and 12:00 PM EST on March 25th, 2026, by contacting CWO Cody Wood at Cody.A.Wood@uscg.mil at least 24 hours prior.
  • Quote Submission: Quotes must be submitted via email to Julia.S.Kline2@uscg.mil. Submissions must include a detailed breakdown of estimated labor and material costs, the vendor's Unique Entity Identifier (UEI) and Tax Identification Number (TIN), the SF-1442 form, and a brief technical proposal demonstrating understanding of the SOW and approach.
  • Technical Proposal: A brief technical proposal is required to demonstrate an understanding of the SOW and describe the approach to fulfilling all requirements.
  • UEI Registration: Vendors must have an active UEI registered via www.SAM.gov.
  • Applicable Clauses: Bidders must review all attachments, including the SOW, Dept. of Labor wage rates, SF-1442, and applicable Provisions and Clauses (e.g., FAR 52.219-1 Small Business Program Representations, FAR 52.225-9 Buy American-Construction Materials).

Important Dates

  • Site Visit Date: March 25th, 2026 (8:00 AM - 12:00 PM EST)
  • Questions Due: April 8th, 2026, 11:00 AM EST
  • Answers Posted: April 7th, 2026, 11:00 AM EST
  • Quotes Due: April 8th, 2026, 11:00 AM EST

Points of Contact

People

Points of Contact

CWO Cody WoodPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
View