J--USFWS_Saratoga NFH_WY_Water Treatment System

SOL #: 140FGA26Q0012Combined Synopsis/Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, SAT TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 27, 2026
2
Last Updated
Mar 24, 2026
3
Submission Deadline
Apr 1, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (USFWS), under the Department of the Interior, is soliciting quotes for the repair and replacement of the water treatment system at the Saratoga National Fish Hatchery in Saratoga, WY. This is a Total Small Business Set-Aside opportunity, issued as a Combined Synopsis/Solicitation (RFQ Number 140FGA26Q0012). Quotes are due by April 1, 2026, at 1300 ED.

Scope of Work

The project involves comprehensive upgrades to the hatchery's water treatment infrastructure. Key tasks include:

  • UV System Reconfiguration: Reconfiguring two existing UV systems (1,200 gpm each), requiring removal of old units, modification of outlet piping, and ensuring 80% transmittance at 126 mJ/cm². Power is 3-phase 240V delta high leg.
  • Oxygen Meter Replacement: Replacing six oxygen flow meters (0.5-15 Lpm) in the raceway building.
  • Pump Piping Reconfiguration: Reconfiguring pump piping to mitigate head issues, replacing existing PVC with steel or new PVC, and maximizing the 10-inch pipeline.
  • Motor Replacement: Replacing motors for 2,000 gpm pumps (approx. 20 HP), which will necessitate electrical upgrades for wiring, conduit, breakers, and Variable Frequency Drives (VFDs) if current capacity is exceeded.
  • Well Pump Electrical Stabilization: Addressing power fluctuations in the main distribution system and connecting wells to the existing alarm system. The contractor is responsible for providing all materials, equipment, and labor to ensure the system is fully operational.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price Construction
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237110 (Small Business Size Standard: $45.0 Million)
  • Estimated Magnitude: Between $25,000 and $250,000
  • Period of Performance: 80 calendar days from Notice to Proceed (NTP).
  • Solicitation Questions Due: March 20, 2026 (passed)
  • Quotes Due: April 1, 2026, 1300 ED
  • Published Date: March 24, 2026 (Amendment 1)

Evaluation

Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. Evaluation will consider (1) Technical Acceptability (based on Project Approach and Past Performance/Past Experience) and (2) Price.

Special Requirements & Notes

  • All quotes must be submitted electronically to Thomas_ikner@fws.gov.
  • Respondents must be actively registered in the System for Award Management (SAM.gov) at the time of award.
  • Prevailing wage rates, as outlined in General Decision WY20260041, apply.
  • Electronic submittals of all required documentation (permits, warranties, product data) are necessary for approval prior to work commencement.
  • Typical working hours are 7:30 am to 4:00 pm, Monday through Friday, with deviations requiring COR approval.
  • Contact for inquiries: Thomas Ikner (thomas_ikner@fws.gov).

People

Points of Contact

Ikner, ThomasPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 27, 2026