J--USFWS SARATOGA NFH_WYOMING_WATER TREATMENT SYSTEM

SOL #: 140FGA26Q0012Award Notice

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, GAOA
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 27, 2026
2
Last Updated
May 4, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (USFWS), under the Department of Interior, issued a Total Small Business Set-Aside solicitation for Well Pump Electrical Stabilization services at the Saratoga National Fish Hatchery in Wyoming. This Firm Fixed Price Construction contract aims to address power fluctuations and integrate well pumps into the existing alarm system.

Scope of Work

This opportunity, originally broader, was significantly descoped by Amendment 0002. The current scope is limited to Well Pump Electrical Stabilization. This involves:

  • Addressing power fluctuations in the main distribution system that cause damage to electrical components.
  • Connecting the wells to the existing alarm system (installed in 2025).
  • The existing power is 3-phase and 40 amps. The well is not connected to a generator. The contractor is responsible for providing all materials, equipment, and labor to make the system operational.

Contract Details

  • Contract Type: Firm Fixed Price Construction
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Magnitude: Between $25,000 and $250,000
  • Period of Performance: 80 calendar days from the Notice to Proceed (NTP). Construction is generally restricted to Monday-Friday, 7:30 am to 4:00 pm.
  • Place of Performance: Saratoga National Fish Hatchery, Wyoming.

Submission & Evaluation

  • Submission Method: Electronically via email.
  • Updated Quotes Due: April 20, 2026.
  • Evaluation Factors: Lowest-Price Technically Acceptable (LPTA), assessed on Project Approach and Past Performance/Experience.
  • Offer Validity: Minimum of 60 calendar days from submission.

Key Clarifications & Amendments

  • Amendment 0002 (April 10, 2026): Descoping the original work to only include "Well Pump Electrical Stabilization" and extending the due date for updated quotes.
  • Amendment 0001 (March 24, 2026): Extended the original solicitation's offer receipt date.
  • Q&A (March 24, 2026): Clarified details regarding wells, piping, pumps, electrical, and UV systems, and stated bids were due April 1 (superseded by Amd 0002).
  • Specifications: A Project Manual (Attachment 4) provides a comprehensive index to construction documents, including electrical, plumbing, and general requirements. Detailed electrical schematics and bills of materials are available in Attachment 3. Prevailing wage rates for Wyoming are provided in Attachment 2.

Contact Information

People

Points of Contact

Ikner, ThomasPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Award Notice
Posted: May 4, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 24, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
J--USFWS SARATOGA NFH_WYOMING_WATER TREATMENT SYSTEM | GovScope