VALVE,CONTROL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP WEAPON SYSTEMS SUPPORT MECH) is soliciting proposals for the repair and refurbishment of CONTROL VALVES. This opportunity involves material designated as Special Emphasis SUBSAFE/Non-Level I, critical for shipboard systems, requiring stringent quality control. The contract type is Not To Exceed (FIRM FIXED PRICE), subject to downward negotiations. Proposals are due by June 8, 2026.
Scope of Work
This requirement is for the inspection and refurbishment of control valves to specific technical data packages (TDPs), including CAGE 78062, drawing 20405-001, and Maintenance Standard MS 5560-081-086 Rev C CHG 4. Key aspects include:
- Refurbishment: Parts replaced must conform to the TDP. The Prime Contractor must be the OEM for sole source repair.
- Certifications: Requires a Certificate of Tests (for non-destructive, hydrostatic, and operational testing) and a Certificate of Compliance for SUBSAFE/Non-Level I material, traceable to each serialized component.
- Quality Assurance: Contractors must maintain a quality system in accordance with ISO-9001 (or MIL-I-45208 as an alternate) and calibration system requirements of ISO-10012 or ANSI-Z540.3 (or MIL-STD-45662). Government Quality Assurance will be performed at the source.
- Welding/Brazing: Procedures and qualification data must be submitted for review and approval prior to performing any welding or brazing.
- Configuration Control: Contractors must maintain total equipment baseline configuration. Waivers/Deviations and Engineering Change Proposals (ECPs) require Government review and approval.
- Mercury Free: Hardware and supplies must be mercury-free.
Contract & Timeline
- Type: Not To Exceed (FIRM FIXED PRICE), subject to downward negotiations.
- Set-Aside: None specified.
- Response Due: June 8, 2026, 8:30 PM EDT.
- Published: May 22, 2026.
Submission Requirements
Certification data, including Certificates of Compliance and Tests, must be submitted to Portsmouth Naval Shipyard via Wide Area Work Flow (WAWF) prior to each shipment. Welding procedures and qualification data must be submitted within 120 days after contract award for approval.
Contact Information
For inquiries, contact NOELLE.M.SMITH10.CIV@US.NAVY.MIL or 717-605-3992.