WA ERFO FS MTBKR605 2022-1(3) Mt. Baker - Forest Road 11 MP 23.9 Repair

SOL #: 69056726B000002Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Concrete, WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Oct 28, 2025
2
Last Updated
Mar 19, 2026
3
Submission Deadline
Mar 18, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Transportation, Federal Highway Administration is soliciting bids for the WA ERFO FS MTBKR605 2022-1(3) Mt. Baker - Forest Road 11 MP 23.9 Repair project. This Total Small Business Set-Aside opportunity involves emergency roadway repair in the Mt. Baker-Snoqualmie National Forest, Whatcom County, Washington. The Engineer's Estimate for this Firm Fixed-Price contract is $1,264,330.00. Bids are due March 18, 2026, by 2:00 p.m. local time.

Scope of Work

This project entails the repair of approximately 0.038-0.039 miles of Forest Road 11 at Milepost 23.9, addressing a roadway failure caused by atmospheric rivers in late 2021. Key requirements include:

  • Earthwork: Subexcavation, grading, aggregate surfacing, select borrow, clearing, grubbing, and tree removal.
  • Structural & Geotechnical: Root-wad/riprap embankment, reinforced soil slopes, earthwork geosynthetics, slope reinforcement, and deep patch construction utilizing geogrid and aggregate layers.
  • Environmental Mitigation: Willow pole cuttings, temporary stream diversion, erosion control products, turf establishment, and environmental design elements such as log deflectors and root wads. A fallen tree in Shannon Creek may require relocation or salvage.
  • Ancillary Services: Construction Survey & Staking, Contractor Quality Control & Testing, Soil Erosion & Sediment Control, and Temporary Traffic Control.
  • Compliance: Work is governed by FAR, agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. Contractors must use the "Masterworks" web-based system for daily records.

Contract Details

  • Type: Firm Fixed-Price
  • Estimated Value: Engineer's Estimate: $1,264,330.00
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed, with completion not later than September 11, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Bonds: Performance and Payment Bonds are required.

Submission & Evaluation

  • Proposal Deadline: March 18, 2026, by 2:00 p.m. local time.
  • Submission Method: Printed copies of bids must be submitted to the address listed on SF 1442; electronic bids are not accepted.
  • Evaluation Criteria: Award will be based on price and price-related factors.
  • Questions: Technical questions should be submitted via email to wfl.plans-spec@dot.gov. General questions can be directed to wfl.contracts@dot.gov or by phone at 360-619-7520. Questions regarding the proposed work will be accepted until close-of-business 5 business days before the due date.

Important Notes

Government-furnished stockpile areas are designated for rootwad and log deflector retrieval only; disposal of unsuitable or excess materials or staging of equipment at these locations is not permissible. Backfill, aggregate, and topsoil must be secured from commercial sources certified as free of noxious weeds, and contractors are not permitted to use sources within the forest boundaries. Viewing the project site may be difficult due to snow conditions.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
View
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Mar 19, 2026
View
Version 7Viewing
Solicitation
Posted: Mar 18, 2026
Version 6
Solicitation
Posted: Mar 16, 2026
View
Version 5
Solicitation
Posted: Mar 6, 2026
View
Version 4
Solicitation
Posted: Feb 17, 2026
View
Version 3
Solicitation
Posted: Feb 10, 2026
View
Version 2
Pre-Solicitation
Posted: Oct 28, 2025
View
Version 1
Pre-Solicitation
Posted: Oct 28, 2025
View