WA NP MORA 11(1), Fryingpan Creek Bridge

SOL #: 69056726B000001Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 19, 2025
2
Last Updated
May 12, 2026
3
Submission Deadline
Jun 18, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting bids for the Fryingpan Creek Bridge Replacement Project (WA NP MORA 11(1)) within Mount Rainier National Park, Washington. This project involves the construction of a new bridge, roadway realignment, and associated infrastructure. The estimated value is between $15,000,000 and $25,000,000. Bids are due June 18, 2026, at 1400 local time.

Scope of Work

The project primarily entails the replacement and realignment of the Fryingpan Creek Bridge. Key deliverables include:

  • Construction of a new single-span, 218.5-foot long steel plate girder bridge with a cast-in-place concrete deck, founded on deep foundations (drilled shafts).
  • Demolition of the existing steel arch girder bridge upon completion of the new structure.
  • Roadway realignment and construction of new parking facilities.
  • Minor pipe culvert replacement and stone masonry work, including salvaging and constructing new masonry to match existing historic character.
  • Various earthwork, aggregate, asphalt, and concrete paving elements, slope reinforcement, and retaining walls.
  • Implementation of traffic control measures, including permanent and temporary markings, barricades, and signage.
  • Mitigation efforts such as log deflectors and root wads.

Work is to be performed under two separate bid schedules, A and B, and bidders must complete both. All work must comply with Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, using U.S. Customary units.

Contract Details

  • Contract Type: Firm Fixed-Price with Economic Price Adjustment.
  • Estimated Value: $15,000,000 to $25,000,000.
  • Period of Performance: Commencement within 10 calendar days after notice to proceed, with completion not later than September 28, 2029, for both Schedule A and B.
  • Set-Aside: Open Competition. A low bidder who is a LARGE business must submit an acceptable subcontracting plan prior to contract award. This requirement does not apply to small businesses.
  • Solicitation Number: 69056726B000001.

Submission & Evaluation

  • Bids Due: June 18, 2026, at 1400 local time.
  • Submission Method: Printed copy only; electronic bids, facsimile, and email bids are not authorized.
  • Requirements: Proposal submission requires a completed "Authority to Sign" document, completed Representations & Certifications, and a bid bond.
  • Evaluation Factor: A 10% price evaluation factor will be applied to an apparent low bid from a large business if a HUBZone small business also submits a bid.

Additional Notes

Prospective bidders are encouraged to view the project site, though no Federal Highway Administration personnel will be available for site visits or show-me tours. General and technical questions regarding the proposed work will be accepted until 5 business days from the due date. General questions can be directed to wfl.contracts@dot.gov or by phone at 360-619-7520. Technical questions should be submitted via email to wfl.plans-spec@dot.gov.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: May 12, 2026
Version 2
Pre-Solicitation
Posted: Feb 23, 2026
View
Version 1
Pre-Solicitation
Posted: Sep 19, 2025
View
WA NP MORA 11(1), Fryingpan Creek Bridge | GovScope