Warehousing, Equipment Receipt, and Pre‑Shipment Support

SOL #: 03122026CMSources Sought

Overview

Buyer

Energy
Energy, Department Of
PNNL CONTRACTS - DOE CONTRACTOR
Richland, WA, 99352, United States

Place of Performance

Richland, WA

NAICS

Other Warehousing and Storage (493190)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Mar 12, 2026
2
Last Updated
Mar 24, 2026
3
Response Deadline
Apr 10, 2026, 7:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Energy's (DOE) Pacific Northwest National Laboratory (PNNL), through Battelle Memorial Institute, has issued a Request for Information (RFI) for Warehousing, Equipment Receipt, and Pre-Shipment Support. This is a market research effort to identify potential providers for a future solicitation. The warehouse facility may be located anywhere in the contiguous United States. Responses are due April 10, 2026.

Purpose

This RFI is for planning purposes only and does not constitute a solicitation or guarantee a future contract award. Its aim is to gather information from industry regarding capabilities for comprehensive warehousing and logistical support services.

Scope of Services

The required services include:

  • Warehousing/Storage Facility: Approximately 20,000 SqFt, 2-high racking, 60-75% utilization, staging space, one loading dock, and two forklifts. The facility must be secure, climate-controlled (50-77°F, <55% RH), pest-controlled, and capable of storing Battelle-provided radiation check sources (e.g., cesium-137, californium-252), which are generally exempt quality but require secure storage. Californium may require NRC licensing. The warehouse must be in the contiguous U.S.
  • Equipment Receipt and Storage: Receive, inspect, verify quantities, and store equipment. Perform function tests within five business days of receipt and report issues within three business days. Provide real-time inventory status, with Battelle providing specifications and API documentation for system design.
  • Procurement of Equipment and Materials: Procure NSDD program equipment (e.g., radioisotope identifiers, survey meters) and materials (e.g., shipping supplies, lead kits), including obtaining warranty, hazardous material safety sheets, and export control information.
  • Modification Support: Perform minor physical configuration modifications to program equipment as directed.
  • Pre-shipment Preparation: Coordinate domestic and export shipments, ensuring DOT compliant handling, packing, and labeling for hazardous and regulated materials. Requires at least one employee trained in hazardous material categories (Class 2.2, 3, 7, 9). One expedited shipment per year is anticipated.

Key Requirements & Preferences

  • Minimum of two (2) years' experience in warehouse management.
  • Project Manager and Warehouse Supervisor to have a minimum of three (3) years' experience.
  • Preference for U.S. Government contracting experience and logistical support experience.
  • Facility clearance is not required for contractor personnel.

Submission Details

Interested parties should email Battelle to express interest as soon as possible. Responses are limited to five pages (12-point font minimum) and should include company details, points of contact, small business status, ownership location, warehouse location, and comments on proposed requirements. Attachments are permitted and are not included in the page limit.

Timeline

  • RFI Responses Due: April 10, 2026
  • Published Date: March 24, 2026

Contact Information

Additional Notes

This RFI is for market research only. The timing for a potential Request for Proposal (RFP) is currently unknown, and the contract structure is yet to be determined.

People

Points of Contact

Kyle OlivierSECONDARY

Files

Files

Download
Download
Download

Versions

Version 2Viewing
Sources Sought
Posted: Mar 24, 2026
Version 1
Sources Sought
Posted: Mar 12, 2026
View
Warehousing, Equipment Receipt, and Pre‑Shipment Support | GovScope