Water Tower Storage Repair & Maintenance
SOL #: 1232SA26Q0514Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Agricultural Research Service
USDA ARS AFM APD
BELTSVILLE, MD, 20705, United States
Place of Performance
Place of performance not available
NAICS
Water and Sewer Line and Related Structures Construction (237110)
PSC
Repair Or Alteration Of Water Supply Facilities (Z2NE)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 22, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
May 20, 2026, 3:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) is soliciting quotations for Water Tower Storage Repair & Maintenance at its Appalachian Fruit Research Station in Kearneysville, WV. This is a Firm Fixed-Price contract for comprehensive repairs and maintenance of a 100,000-gallon water storage tank. This opportunity is a Total Small Business Set-Aside. Offers are due by May 20, 2026, at 10:00 AM local time.
Scope of Work
The contractor will perform comprehensive repairs and maintenance on a 100,000-gallon elevated potable water storage tank. This includes:
- OSHA-required repairs: Installing safety devices and handrails.
- Critical repairs: Interior cleanout.
- Non-critical repairs: Installing flapper valve and anti-vortex assembly.
- Preventative maintenance: Cleaning anchor bolts, replacing nuts, pressure washing, applying paint, and installing cathodic protection.
- Cleaning and housekeeping: To minimize overspray and restore potable water standards. The work aims to ensure compliance with OSHA, State, and Federal requirements and bring the tank back to safety standards. Deliverables include a PM Checklist & Report, Annual Summary Report, updated Asset List, and Parts List.
Contract Details
- Contract Type: Firm Fixed-Price.
- Period of Performance: 90 days after award for all repairs and maintenance tasks.
- Set-Aside: Total Small Business Set-Aside.
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction) with a $45M size standard.
- Evaluation: Lowest Priced Technically Acceptable (LPTA).
- Place of Performance: USDA ARS AFRS facility, 2217 Wiltshire Road, Kearneysville, WV 25430.
Submission & Key Dates
- Mandatory Site Visit: May 6, 2026, at 10:00 AM local time. Registration required by May 5, 2026, via email to kelly.wright@usda.gov and shawn.thomas@usda.gov.
- Questions Due: May 8, 2026, by 10:00 AM Central Time, via email to kelly.wright@usda.gov.
- Offer Submission Deadline: May 20, 2026, by 10:00 AM local time.
- Submission Method: Emailed offers to kelly.wright@usda.gov with the subject "RFQ 1232SA26Q0514".
- Offer Acceptance Period: 60 calendar days from the receipt of offers.
Additional Requirements
- Offerors must be registered in the System for Award Management (SAM) at the time of solicitation closing.
- A bid bond is required for offers of $35,000 or more, not less than 20% of the proposed price, not to exceed $3,000,000.
- Wage Determinations (WV20260037 for Building and WV20260068 for Heavy Construction) are applicable, and bidders must factor these into labor costs.
- Amendment 0001 added FAR clause "52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026)" and AGAR Clause "452.203-72 Unenforceable Supplier Terms (Apr 2026)".
People
Points of Contact
Kelly WrightPRIMARY