West Shore Lake Pontchartrain WSLP 114

SOL #: W912P825B0024Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST NEW ORLEANS
NEW ORLEANS, LA, 70118-3651, United States

Place of Performance

LA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2025
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 28, 2025, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers - New Orleans District is soliciting bids for the West Shore Lake Pontchartrain (WSLP-114) Reserve Relief & I-55 Pump Stations and Drainage Structures project in La Place, LA. This is an Unrestricted, Firm Fixed-Price construction contract, procured under FAR Part 14 (Sealed Bidding), with a Rough Order of Magnitude between $250M - $500M. Bids are due February 6, 2026, by 9:30 AM CST, with a virtual bid opening at 10:30 AM CST on the same day.

Scope of Work

This extensive construction project involves:

  • Site Preparation: Clearing and grubbing, excavation, and embankment placement.
  • Structural Elements: Construction of pump stations, drainage structures, floodwalls (including braced and those adjacent to/under elevated highways), stop logs, wingwalls, precast concrete bridges, steel vehicular swing type flood gates, navigation gates, and draw bridges.
  • Piling & Foundations: Installation of steel sheet piling, H-piling, pipe piles, and precast/prestressed concrete piles.
  • Drainage & Ground Improvement: Placement of geotextile, geogrid, grouted riprap, vertical wick drains, and horizontal strip drains.
  • Ancillary Systems: Installation of metal ladders, stairs, catwalks, railings, slide gates, hoists, miscellaneous metal work, plumbing, and electrical work, including cybersecurity for control systems.
  • Site Finishing: Stone and bedding construction, painting, turf establishment, chain link fencing, surfacing, structural excavation and backfill.
  • Temporary Works: Construction of temporary retaining structures and dewatering.

Contract & Timeline

  • Solicitation Number: W912P825B0024
  • Type: Firm Fixed-Price (FAR Part 14, Sealed Bidding)
  • Set-Aside: Unrestricted
  • NAICS: 237990 (Construction Of Other Non Building Facilities)
  • Rough Order of Magnitude: $250M - $500M
  • Bid Due Date: February 6, 2026, no later than 9:30 AM CST
  • Bid Opening: February 6, 2026, at 10:30 AM CST (Virtual via Microsoft Teams)
  • Published Date: April 1, 2026 (Latest update)

Key Amendments & Changes

This solicitation has undergone 11 amendments. The latest amendments confirm the bid due and opening dates. Notably, Amendment 0010 removed the requirement for Project Labor Agreements (PLAs), which had been previously added by Amendment 0005. Amendment 0011 also confirmed that no additional questions will be accepted.

Relevant Documents

The solicitation package includes comprehensive drawing sets (WSLP_114_Signed Submittal Drawings-1 to 4 of 4) providing critical details on general notes, standard details, engineering drawings for grading, drainage, paving, canal armoring, electrical schematics, mechanical/plumbing systems, architectural and structural information for pump stations, T-walls, drainage structures, draw bridge, navigation gate, site plans, geotechnical exploration data (boring logs, CPT), and hydrographic data.

Contact Information

People

Points of Contact

Michelle DalmadoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 20
Solicitation
Posted: Apr 1, 2026
View
Version 19
Solicitation
Posted: Jan 20, 2026
View
Version 18
Solicitation
Posted: Jan 6, 2026
View
Version 17
Solicitation
Posted: Dec 17, 2025
View
Version 16
Solicitation
Posted: Oct 22, 2025
View
Version 15
Solicitation
Posted: Aug 13, 2025
View
Version 14
Solicitation
Posted: Jul 15, 2025
View
Version 13
Solicitation
Posted: Jul 3, 2025
View
Version 12
Solicitation
Posted: Jun 25, 2025
View
Version 11
Solicitation
Posted: Jun 5, 2025
View
Version 10
Solicitation
Posted: Jun 5, 2025
View
Version 9
Solicitation
Posted: May 20, 2025
View
Version 8
Solicitation
Posted: May 14, 2025
View
Version 7
Solicitation
Posted: May 14, 2025
View
Version 6
Solicitation
Posted: May 8, 2025
View
Version 5
Solicitation
Posted: Apr 24, 2025
View
Version 4
Solicitation
Posted: Apr 21, 2025
View
Version 3Viewing
Solicitation
Posted: Apr 21, 2025
Version 2
Solicitation
Posted: Feb 28, 2025
View
Version 1
Solicitation
Posted: Feb 27, 2025
View