Wilson and Kanopolis Lake Roadwork Project FY26, United States Army Corps of Engineers, Kansas City District

SOL #: PANNWD26P0000030989Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST KANSAS CITY
KANSAS CITY, MO, 64106-2896, United States

Place of Performance

KS

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 12, 2026
2
Response Deadline
Jun 26, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE), Kansas City District (NWK), is conducting market research via a Sources Sought notice for the Wilson and Kanopolis Lake Roadwork Project FY26. This initiative aims to identify qualified contractors capable of performing existing road maintenance, including HMA patching, chip sealing, and concrete construction at Kanopolis Lake (Marquette, KS) and Wilson Lake (Sylvan Grove, KS). The government will use responses to determine potential small business set-asides or full and open competition for a future solicitation. Responses are due June 26, 2026, at 5:00 PM CT.

Scope of Work

The project requires comprehensive road maintenance services at both Kanopolis and Wilson Lakes. Key tasks include:

  • HMA Patching and Double Chip Sealing on Minooka Park main and loop roads at Wilson Lake.
  • HMA Patching and Single Chip Sealing on Venango Park main and loop roads at Kanopolis Lake.
  • Concrete replacement at boat maneuver areas, administration buildings, and ADA camp pads at both locations. Contractors must provide all necessary plant, labor, equipment, and materials. The project is structured with a Base CLIN and multiple Optional CLINs, and work will be subject to the Davis-Bacon Act. The estimated period of performance is 270 days after Notice to Proceed (NTP).

Contract & Timeline

  • Type: Sources Sought / Market Research
  • NAICS: 237310 Highway, Street, and Bridge Construction (Small Business Size Standard: $45,000,000)
  • Set-Aside: Market research will determine potential small business set-asides (all categories considered) or full and open competition.
  • Estimated Period of Performance: 270 days after NTP.
  • Response Due: June 26, 2026, 5:00 PM CT.
  • Published: June 12, 2026.

Submission Requirements

Interested firms must submit the following minimum requirements:

  • Company Information: Name, Mailing Address, Contact Phone/Email, CAGE Code, SAM UEI, and indicate if using a joint venture or partnering.
  • Capability: Provide relative experience demonstrating the firm's ability to perform this requirement.
  • Capacity: Confirm the firm's ability to accomplish the requirement of similar magnitude.
  • Small Business Compliance: Ability to successfully comply with FAR 52.219-8, Utilization of Small Business Concerns.
  • Business Type & Size: Current small business category (e.g., Small Business, HUBZone, SDVOSB, WOSB, 8(a)) as it relates to NAICS 237310. Responses should be submitted electronically in Microsoft Word or PDF format to Seth Balsters (Seth.B.Balsters@usace.army.mil) and Laura Hedrick (Laura.L.Hedrick@usace.army.mil).

Additional Notes

This is for informational purposes only and does not constitute a commitment to procure. A site visit may be held during a future solicitation period, but attendance is not required for this Sources Sought. CAGE codes and UEIs are required for future bids but not for this Sources Sought response. Responses will be treated as Controlled Unclassified Information (CUI).

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: Jun 12, 2026
Wilson and Kanopolis Lake Roadwork Project FY26, United States Army Corps of Engineers, Kansas City District | GovScope