Building 3030 Furniture Refresh

SOL #: FA560626QA007Combined Synopsis/Solicitation

Overview

Buyer

APO, AE, 09126-3910, United States

Place of Performance

Spangdahlem, DE-RP, Germany

NAICS

Other Building Finishing Contractors (238390)

PSC

Installation Of Equipment: Furniture (N071)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 6, 2026
2
Last Updated
May 18, 2026
3
Submission Deadline
May 20, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This Combined Synopsis/Solicitation is for the Building 3030 Furniture Refresh project at Spangdahlem Air Base, Germany. The requirement involves the delivery and installation of modern, custom-designed furniture for 15 workstations within the Wing Operations Center (WOC), including the removal of existing furniture. Quotes are due by May 20, 2026, at 14:00 CEST.

Scope of Work

The contractor will provide all labor, tools, materials, equipment, transportation, and supervision to deliver and install new furniture systems that maximize floor space and support 15 fully functional workstations. Key tasks include:

  • Constructing and installing custom furniture.
  • Incorporating under-desk power solutions with surge protection and cable pass-throughs.
  • Integrating cable management channels.
  • Providing desk-mounted video wall capabilities with modular arms for multiple monitors.
  • Supplying ergonomic seating with lumbar support, durable upholstery, and height-adjustable features.
  • Utilizing durable materials like laminate or composite surfaces with scratch-resistant finishes.
  • Disassembling existing furniture for government reuse, ensuring careful handling. Detailed dimensions for Room 1 (22 ft 5 in x 17 ft 6½ in) and Room 2 (31 ft 2½ in x 17 ft 6½ in) are provided in Attachment 2, which are crucial for planning and design.

Contract Details

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: None (due to overseas location)
  • Product Service Code: N071 (Installation Of Equipment: Furniture)
  • NAICS Code: 337214 (Office Furniture (except Wood) Manufacturing)
  • Place of Performance: Spangdahlem Air Base, Germany
  • Funding: Award is contingent upon the availability of funds.

Key Requirements & Deliverables

Offerors must supply and install 15 WOC Furniture Desks and 15 WOC Furniture Chairs, along with installation and delivery services. Submissions must include a Price Exhibit and a Technical Exhibit detailing specification compliance and a timeline for design, build, delivery, and installation. Performance Standards: A joint post-installation inspection will be conducted. Any identified damage must be documented on a punch list and addressed within 14 calendar days. All closeout documentation, including warranties and as-built notes, is required prior to final acceptance. Special Requirements: Contractor personnel require base access (escorted by 52 SFS), valid identification (passport/EU ID), and will undergo background checks. Materials and tools must enter via the Large Vehicle Inspection Area at Gate 3. Personnel must hand-carry items inside the WOC, avoiding damage to existing property.

Evaluation & Submission

Award will be made using a Lowest Price Technically Acceptable (LPTA) source selection process. Evaluation will consider Price and Technical factors, with technical acceptability rated as "acceptable" or "unacceptable." The lowest-priced technically acceptable quotation will be selected. Offerors must be registered in SAM.gov with a Unique Entity Identifier (UEI).

Timeline & Updates

  • Response Due: May 20, 2026, 14:00 CEST
  • Published: May 18, 2026
  • Updates: A site visit was held on May 12, 2026, at 13:00 CEST. Questions and Answers, as well as Meeting Minutes from the site visit, have been published in the attachment section of this opportunity.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Combined Synopsis/Solicitation
Posted: May 18, 2026
Version 6
Combined Synopsis/Solicitation
Posted: May 15, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 2
Pre-Solicitation
Posted: Feb 6, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 6, 2026
View