WMF Rob Brook Bridge Replacement

SOL #: 12445526Q0070Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Campton, NH

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 2, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jul 1, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service (USFS) is soliciting quotes for the WMF Rob Brook Bridge Replacement project on the White Mountain National Forest in Campton, NH. This opportunity, issued as an RFQ (Solicitation #12445526Q0070), is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. The project involves the demolition of an existing 28-foot bridge and the construction of a new 44-foot bridge. Quotes are due electronically by 1700 CDT on July 1, 2026.

Scope of Work

The project requires the reconstruction of the Rob Brook Road Bridge. Key tasks include:

  • Demolition of the existing 28-foot timber bridge and proper disposal of all materials off Forest Service lands.
  • Construction of a new 44-foot single-span steel girder bridge with a timber nail-lam deck, concrete abutments, and micropile foundations.
  • Additional work such as armoring the shore with riprap, guardrail installation, and approach surface treatment.
  • The contractor must provide all labor, supervision, equipment, tools, permits, and incidentals.
  • Specific requirements include adherence to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), implementation of temporary erosion control, traffic control (road closure), and a Spill Prevention, Control, and Countermeasures Plan.
  • The government will furnish steel stringers, which the contractor must retrieve from a storage site.

Contract & Timeline

  • Contract Type: Firm Fixed Price Purchase Order anticipated.
  • Period of Performance: 150 days after Notice to Proceed (NTP), with all work to be completed no later than December 30, 2026.
  • Project Magnitude: Between $1,000,000 and $5,000,000.
  • Set-Aside: 100% Total Small Business under NAICS 237310 (Highway, Street, and Bridge Construction).
  • Questions Due: By 1300 CDT on June 22, 2026.
  • Quotes Due: By 1700 CDT on July 1, 2026.
  • Published Date: June 4, 2026.

Submission & Evaluation

  • Quotes must be submitted electronically and will be evaluated based on price reasonableness.
  • Award will be made to the responsive, responsible vendor with the lowest price that meets technical requirements.
  • Required submissions include pricing for all items (using the provided fillable Schedule of Items), a Basis of Estimate (BOE), and a scanned copy of a fully executed Bid Guarantee (SF 24 and Power of Attorney).
  • Offerors are strongly urged to inspect the site prior to submitting a quotation.
  • The applicable wage determination is DBAWD NH20260033.

Point of Contact

Matthew (Matt) Killian, Contracting Officer, matthew.killian@usda.gov.

People

Points of Contact

Matthew (Matt) KillianPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jun 4, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
View