WWYK190021 Repair Overhead Doors, Fire Station, B989

SOL #: FA813726R0034Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

No set aside specified

Timeline

1
Posted
May 20, 2026
2
Submission Deadline
Jun 25, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the repair and replacement of four overhead doors at Fire Station Building 989, Tinker Air Force Base, Oklahoma. This opportunity, valued below $25M, is restricted to Tinker AFB Small Business MAC BOA Holders ONLY. A mandatory initial site visit is scheduled for May 26, 2026, and proposals are due by June 25, 2026.

Scope of Work

This project, designated WWYK190021, involves the comprehensive repair by replacement of four overhead doors at Fire Station B989. The scope includes:

  • Demolition of two existing overhead rollup doors on the East side and two on the West side.
  • Installation of four new Cornell 1024 High Performance Rapid Rolling Overhead Doors (or approved equal) with vision windows, meeting OSHA and UL 325 safety requirements.
  • Associated architectural work, including patching and repainting areas around new doors.
  • Electrical work, including disconnecting and reconnecting conductors for the new doors, as detailed in the provided drawings (Sheets ED-101, E-101).
  • A site investigation to verify existing conditions and identify logistical, architectural, and structural elements.
  • Phased construction: North two doors first, then South two doors.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Estimated Value: Below $25M.
  • Set-Aside: Restricted to Tinker AFB Small Business MAC BOA Holders ONLY.
  • Performance Period: Work to be completed within 10 calendar days, within 145 calendar days after award/Notice to Proceed.
  • Place of Performance: Fire Station, BLDG 989, Tinker Air Force Base, Oklahoma.

Submission & Site Visit

  • Mandatory Initial Site Visit: Tuesday, May 26, 2026, at 0900 CST at Building 989. Attendance is required for eligibility to propose.
  • RSVP for Site Visit: Must be sent to Contracting Points of Contact within 3 calendar days from the posting date (by May 23, 2026). Include base access requirements (EAL) for all attendees. Only MAC BOA Prime Contractors are to RSVP.
  • Proposal Due Date: June 25, 2026, by 02:00 PM local time.
  • Submission: Proposals must be submitted to the address specified in Item 8 of the Solicitation.
  • Offer Validity: Offers must be valid for at least 120 calendar days.
  • Bonds: Performance and Payment Bonds are required within 10 calendar days of award.
  • Invoicing: Electronic invoicing via Wide Area WorkFlow (WAWF) is required.

Evaluation

Award will be based on evaluation factors detailed in Sections L and M of the Solicitation.

Special Requirements

  • Personnel: Contractor personnel require AFMC Form 387 badges for base access. Key personnel (PM, QCM, SSHO, Project Superintendent) must meet specific experience requirements.
  • Work Area: Project is in an airfield operations and controlled/restricted area, requiring coordination, specific access procedures (Airfield Construction Waiver, Secure Area Badges), and Foreign Object Debris (FOD) awareness training.
  • Quality Control: Must adhere to specification section 01 45 00.00 10, with an established inspection system and deficiency prevention methods.
  • Submittals: A comprehensive Submittal Register (Att10) outlines all required documentation, including specifications, product data, and test reports. A baseline construction schedule is required within 10 days of NTP.

People

Points of Contact

De'Vonn LyonsSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 20, 2026
WWYK190021 Repair Overhead Doors, Fire Station, B989 | GovScope