WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8

SOL #: 69056726R000006Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Jackson, WY

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 8, 2026
2
Last Updated
Mar 23, 2026
3
Submission Deadline
May 5, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting proposals for Project WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8 within Grand Teton National Park, Wyoming. This is a Task Order Request for Proposals (TORP) issued under the Yellowstone & Grand Teton Multiple Award Task Order Contract (MATOC) and is restricted to specific MATOC IDIQ holders only. The project involves significant road repair and stabilization work. Proposals are due May 5, 2026.

Scope of Work

This project focuses on repairing a 0.07-mile section of North Park Road at Milepost 15.8, addressing issues related to landslides and roadway settlement. Key deliverables include:

  • Asphalt surface repair and deep patching
  • Roadway excavation and geotechnical stabilization
  • Installation of an underdrain system
  • Clearing and grubbing, removal and installation of culverts
  • Earthwork geosynthetics (stabilization geotextile)
  • Crushed aggregate and asphalt concrete pavement
  • Temporary and permanent traffic control measures, including pavement markings and sign systems.

Work is governed by Federal Acquisition Regulation (FAR) and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. The contractor must use the "Masterworks" web-based system for daily reports.

Contract Details

  • Contract Type: Firm-fixed-price task order contract
  • Estimated Price Range: $700,000 to $2,000,000
  • Period of Performance: Work to commence within 10 calendar days of notice to proceed, with completion no later than September 23, 2026.
  • Set-Aside: This opportunity is restricted to pre-selected MATOC IDIQ holders (H-K Contractors, Inc.; M.A. Deatley Construction, Inc.; Missouri River Contractors, LLC; Oftedal Construction, Inc.; Riverside Contracting Inc; Sundt Construction, Inc.). Large businesses must submit an acceptable subcontracting plan.

Submission & Evaluation

  • Proposal Due Date: May 5, 2026, by 4:00 p.m. local time.
  • Submission Method: Electronic proposals will NOT be accepted; printed copies are required.
  • Evaluation: Selection will be based on the lowest price.
  • Questions: Requests for technical information must be submitted in writing via email to wfl.plans-spec@dot.gov. Questions and answers will be posted on SAM.gov.

Additional Notes

This solicitation is advertised on SAM.gov to publicize opportunities for potential subcontractors. The project addresses known landslide and settlement issues on North Park Road, with previous field reports detailing the historical context and temporary repair recommendations for the area.

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Mar 23, 2026
Version 1
Pre-Solicitation
Posted: Jan 8, 2026
View
WY NP GRTE 13(1), Repair North Park Road at Milepost 15.8 | GovScope