Y--GARNET HILL RECREATION AREA IMPROVEMENTS

SOL #: 140L0626B0006Sources Sought

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL OPERATIONS CENTER
DENVER, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Recreation Facilities (Non Building) (Y1PA)

Set Aside

No set aside specified

Timeline

1
Posted
May 8, 2026
2
Response Deadline
May 18, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM) is conducting market research via a Sources Sought notice for the Garnet Hill Recreation Area Improvements project in White Pine County, Nevada. This effort aims to assess industry interest, capability, qualifications, and experience to inform the acquisition strategy, including potential small business set-aside determinations. Responses are due by May 18, 2026, at 2:00 PM MDT.

Project Scope

The project involves significant construction to enhance the Garnet Hill Recreation Area. Key improvements include new and upgraded access roads, trailheads, campgrounds (upper and lower with single/group campsites), parking areas, signage, and ADA-accessible features. The scope also covers picnic/day-use areas, vault toilets, and related site amenities. Specific areas of focus include the expansion of the Garnet Hill Main Trailhead and additive work for Egan Crest, Keystone Junction, and Lackawanna Road trailheads. Pole Line Road improvements will involve widening, Arizona crossings, and riprap slope stabilization.

Key Requirements / Deliverables

Required capabilities include experience in heavy civil construction and recreational infrastructure, specifically earthwork, grading, drainage improvements, aggregate parking areas and access roads, recreational trail construction/rehabilitation, concrete work, and erosion/stormwater control. Work will be conducted in remote or environmentally sensitive public-use areas.

Contract Details

  • Anticipated Period of Performance: Completion by December 2027, with seasonal weather restrictions from November through May.
  • Bonding: Bid, performance, and payment bonds will likely be required, with an anticipated bonding capacity of approximately $6 million.
  • Anticipated Solicitation Issuance: June 2026.
  • Set-Aside: None specified; responses will influence future set-aside decisions.

Submission Requirements

Interested businesses (large or small) should submit:

  • Company name, SAM UEI, address, Point of Contact, phone, email.
  • Business classification (large/small, and specific small business socioeconomic classifications if applicable).
  • Information demonstrating experience on similar size and scope projects (heavy civil construction, recreational infrastructure).
  • Statement regarding bonding capacity.

Response Due

Additional Notes

This is a Sources Sought notice; proposals are not requested or accepted at this time. Responses are voluntary and will not be reimbursed. Draft specifications and drawings are provided for review and comment.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: May 8, 2026
Y--GARNET HILL RECREATION AREA IMPROVEMENTS | GovScope