Y--GOGA 244458 & FOPO 186401 Construct Bike Path at West Bluff Trailhead and Long
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS) Denver Service Center is issuing a Pre-Solicitation Notice for an upcoming Firm-Fixed-Price (FFP) contract to construct a bike path and improve roadways at the West Bluff Trailhead and Long Avenue in Presidio, San Francisco, CA. This project aims to enhance cyclist and pedestrian accommodation and relieve vehicle congestion. The formal Request for Proposal (RFP) is anticipated to be issued on or after June 12, 2026. This opportunity is a Small Business Set-Aside.
Scope of Work
The project involves significant roadway and pathway improvements. Key elements include:
- Construction of approximately 1,100 linear feet of new paved bike path along the West Bluff Trailhead parking area.
- Improvements to Long Avenue (approx. 1,200 linear feet) to accommodate an uphill bike lane, including widening where sufficient roadway bench exists.
- Construction of a vehicle turnaround at the north/west terminus of the West Bluff Trailhead parking area.
- Relocation of existing light poles and electrical vehicle charging stations.
- Construction of several small retaining walls.
- Replacement of guardrails and chain-link fencing along Long Avenue.
- Reconstruction of an historic masonry drainage ditch.
- Reconstruction of the intersection of Long Avenue and Marine Drive, and an adjacent "plaza" area, to integrate the bike path, provide gated administrative vehicle access, and improve pedestrian safety. The site is an urban area with limited staging, historic features requiring protection, and the park will remain open during construction.
Contract & Timeline
- Contract Type: Firm-Fixed-Price (FFP), Stand-Alone Contract
- Anticipated Period of Performance: 365 calendar days from Notice to Proceed (NTP)
- Estimated Magnitude: $1 Million - $5 Million
- Product Service Code (PSC): Y1LB – Construction Of Highways, Roads, Streets, Bridges, And Railways
- NAICS Code: 237310 – Highway, Street, and Bridge Construction
- Small Business Size Standard: $45,000,000
- Set-Aside: Small Business Set-Aside
- Anticipated RFP Issuance: On or after June 12, 2026
- Published Date: May 27, 2026
Evaluation
Award will be made using a Trade-off process (best value continuum) based on FAR 15.101-1. Evaluation factors will include Project experience, Technical approach, Schedule, and Key personnel. These factors, combined, are significantly more important than price.
Additional Notes
Prospective offerors must have an active registration in the Systems for Awards Management (SAM) and a UEI number. A Pre-Proposal Conference and Site Visit are anticipated after the RFP is issued and before the proposal due date. Interested parties should periodically check SAM.gov for the formal RFP (Solicitation No. 140P2026R0066) and any amendments or changes. All inquiries must be submitted in writing to the Contracting Officer, Samantha Cahill (samantha_cahill@nps.gov).