Y--GOGA CONSTRUCT STINSON LG TOWER & CAFE

SOL #: 140P8526R0007Solicitation

Overview

Buyer

Interior
National Park Service
PWR SF/SEA MABO(85000)
SAN FRANCISCO, CA, 94104, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 21, 2026
2
Last Updated
Jun 3, 2026
3
Submission Deadline
Jun 20, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the construction of the Stinson Beach Lifeguard Tower and Cafe at the Golden Gate National Recreation Area (GOGA) in Marin County, California. This project involves the demolition of the existing facility, abatement of hazardous materials, and construction of a new code-compliant structure. The estimated magnitude is $1,000,000 to $5,000,000. Proposals are due by June 20, 2026.

Scope of Work

The project requires comprehensive construction services, including:

  • Demolition of the existing Lifeguard Tower and Cafe.
  • Abatement of identified hazardous materials (asbestos, lead-based paint) as detailed in the Hazmat Survey Report.
  • Construction of new concrete and wood foundations, utilizing a deep foundation system of prestressed concrete piles due to liquefiable soil conditions identified in the Geotechnical Investigation Report.
  • Erection of a new wood-framed structure with specific structural and seismic design parameters, as outlined in the Structural Calculations and Construction Drawings.
  • Installation of plumbing, electrical, mechanical (HVAC), and communication systems, adhering to California Energy Code for indoor and outdoor lighting.
  • Application of interior and exterior finishes.
  • Construction of an accessible boardwalk, paths, and a dining patio.
  • Development of a warm-shell for a future cafe.
  • Implementation of environmental mitigation strategies, including dune restoration, revegetation, and invasive species control, as per the Dune Mitigation and Monitoring Report.
  • Compliance with detailed specifications (Division One and Two), drawings, and prevailing Davis-Bacon Wage Rates for California (WD_CA20260007).

Contract & Timeline

  • Contract Type: Firm-Fixed-Price
  • Estimated Magnitude: $1,000,000 to $5,000,000
  • Period of Performance: August 3, 2026, to November 3, 2027 (as updated by Amendment 0001).
  • Set-Aside: None specified.
  • Proposals Due: June 20, 2026, at local time.
  • Published Date: June 3, 2026.

Submission & Evaluation

Offers must be submitted electronically via email. The evaluation will follow a Best Value Continuum Tradeoff Process, considering:

  • Technical Factors: Experience with remote/coastal environments, subcontractors, and governmental/utility agencies.
  • Past Performance.
  • Price: Evaluated for reasonableness and balance. The Government reserves the right to reject any or all offers.

Key Attachments & Notes

Bidders should review critical attachments, including the Bid Schedule (B08_Attachment_14) for pricing, Division One and Two Specifications (B08_Attachment_1, B08_Attachment_2) for general and technical requirements, Hazardous Materials Survey Report (B08_Attachment_7) for abatement scope, Geotechnical Investigation Report (B08_Attachment_8) for foundation requirements, and Construction Drawings (B08_Attachment_3) for detailed plans. A site visit was held on May 28, 2026, and an attendance record is available.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Jun 3, 2026
Version 2
Solicitation
Posted: May 19, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 21, 2026
View
Y--GOGA CONSTRUCT STINSON LG TOWER & CAFE | GovScope