Y--HI-MIDWAY ATOLL NWR-SEWER SYS-REPAIRS

SOL #: 140FGA26R0020Sources Sought

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, GAOA
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
May 4, 2026
2
Response Deadline
May 18, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (USFWS) is conducting a Sources Sought for market research purposes to identify qualified firms capable of providing design-build services for significant improvements to the sanitary sewer system and harbor infrastructure at Midway Atoll National Wildlife Refuge (NWR). This is NOT a request for proposals, and no contract will be awarded from this notice. Responses are due by May 18, 2026, at 3:00 PM PT.

Scope of Work

The project involves critical infrastructure repairs at Midway Atoll NWR, which is located on an isolated island with infrastructure dating back to World War II. The scope includes:

  • Sewer System Replacement: Full replacement of major components including piping, lift stations, and manholes, based on 100% design documents. This includes planning, design, and permitting.
  • Harbor Infrastructure Repair/Replacement: Design-build services to repair or replace critical harbor infrastructure, specifically the Tug Pier (base), Harbor Seawall (option), and Finger Piers (small vessel docks; option). Proposed solutions must have a minimum design life of 15 years for short-term repairs or 50 years for long-term replacements.
  • South Seawall Repair: Repair of the south seawall (option) per detailed conceptual design.
  • Environmental Assessment: The contractor will be responsible for preparing draft and final Environmental Assessments (EA) for harbor infrastructure work.

Contract & Timeline

  • Contract Type: Anticipated Firm Fixed Price (FFP)
  • Estimated Value: More than $10,000,000
  • Primary NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (Small Business Size Standard: $45.0 million)
  • Period of Performance:
    • Sewer System Replacement: 730 days from Notice to Proceed (NTP)
    • NEPA Documents and Compliance: 730 days from NTP
    • All Other Tasks: 1,825 days from NTP

Eligibility / Set-Aside

All business categories are invited to respond to this Sources Sought notice.

Submission Requirements

Interested firms must submit a capabilities package via email to shanen_fox@ios.doi.gov by May 18, 2026, 3:00 PM PT. The email subject line must include reference number 140FGA26R0020 and the project title "Midway Consolidated Sewer Sys and Harbor Repairs." The package should include:

  1. Firm's name, address, point of contact, phone, email, business category, size, and type.
  2. Business classification (e.g., Large Business, SB, WOSB, SDVOSB, HUBZone, 8(a)).
  3. Qualifications, capabilities, and ability to perform the required work at Midway Atoll NWR.
  4. Demonstration of capacity (in-house or through teaming/subcontractors).
  5. CAGE code and UEI number.
  6. Joint Venture Information (if applicable).
  7. Statement of interest in submitting a proposal if formally advertised.

Additional Notes

  • The project location is remote, and the contractor must be self-sufficient for all materials, fuel, power, equipment, and personnel. No USFWS utilities will be provided.
  • Strict adherence to environmental regulations, wildlife protection, and bio-security protocols is mandatory.
  • Terrestrial construction is limited to July 15th - October 31st, and material/equipment delivery to May 30th - November 15th.
  • Lodging and meals for up to 20 contractor personnel may be provided on a limited basis; temporary man camps are not permitted.

People

Points of Contact

Fox, ShanenPRIMARY

Files

Files

Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: May 4, 2026