Y--MORA-CAMP MUIR GUIDE BUILDINGS

SOL #: 140P8526R0002Solicitation

Overview

Buyer

Interior
National Park Service
PWR SF/SEA MABO(85000)
SAN FRANCISCO, CA, 94104, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 7, 2026
2
Last Updated
May 21, 2026
3
Submission Deadline
Jun 5, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service, is soliciting proposals for a Firm Fixed-Price construction project to rehabilitate climbing facilities at Camp Muir, Mount Rainier National Park, WA. This Total Small Business Set-Aside opportunity involves demolishing an existing modular building and constructing two new steel-framed climbing shelters, alongside site stabilization work. The estimated magnitude for this project is $1,000,000 to $5,000,000. Proposals are due June 5, 2026.

Scope of Work

The project, titled "Rehabilitate Climbing Facilities at Camp Muir," requires the demolition and disposal of an existing modular building, weather station tower, and retaining wall. Contractors will then undertake site preparation, excavation, and slope stabilization. The core of the work involves the installation of two new steel-framed climbing shelters, complete with weather barriers, siding, windows, and doors. Provisions for a future photovoltaic (PV) system and interior outfitting (bunks, storage, tables) are also included. Site stabilization will utilize geotextile fabric and gabion baskets. The remote, high-altitude location of Camp Muir necessitates careful planning for logistics, weather conditions, and potential helicopter transport, as detailed in the Construction Documents Report.

Contract & Timeline

  • Contract Type: Firm Fixed Price Solicitation
  • Estimated Magnitude: $1,000,000 to $5,000,000
  • Period of Performance: 365 calendar days from Notice to Proceed
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 236220 - Commercial and Institutional Building Construction (Size Standard: $45M)
  • Proposal Due Date: June 5, 2026
  • Published Date: May 8, 2026 (Amendment 0001)
  • Site Visit: A virtual and in-person site visit is scheduled for Friday, May 15, 2026, from 9:00 AM to 10:00 AM PST. The in-person meeting point is the Mount Rainier Visitor Center, Ashford, WA. Offerors must notify the Contracting Officer (CO) or Contracting Officer's Representative (COR) at least 24 hours prior to attend. No site visit will be held at Camp Muir itself.

Evaluation & Requirements

Award will be based on a Best Value Continuum Tradeoff Process. Offerors must be registered in the System for Award Management (SAM). Proposals must be submitted electronically via email to juan_roman@ios.doi.gov. Key attachments include detailed Specifications, Drawings, and Product Cut Sheets which define exact materials, methods, and quality standards. A Past Performance Questionnaire must be completed by offerors and their references for evaluation. Compliance with prevailing wage rates for Pierce County, WA (General Decision WA20260111) and limitation on subcontracting requirements are mandatory. Offerors must acknowledge receipt of Amendment 0001.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: May 21, 2026
View
Version 3Viewing
Solicitation
Posted: May 8, 2026
Version 2
Solicitation
Posted: May 4, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 7, 2026
View
Y--MORA-CAMP MUIR GUIDE BUILDINGS | GovScope