Y--NGWSP INTAKE & RIVER PUMPING PLANT

SOL #: 140R4025R0023Award Notice

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Jun 10, 2025
2
Last Updated
Apr 3, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This is an Award Notice for the Navajo-Gallup Water Supply Project (NGWSP) Intake & River Pumping Plant, awarded by the Department of the Interior, Bureau of Reclamation. The contract is for the construction of a new pumping plant and associated infrastructure near Farmington, NM, with an estimated value between $50M and $80M. The period of performance is from April 3, 2026, to October 20, 2028.

Project Scope

The awarded contract covers the construction of a new River Pumping Plant on the San Juan River, approximately 11 miles west of Farmington, NM. Key elements include extensive sitework, installation of a cement-bentonite cutoff wall, steel manifold piping, a metal building system with concrete structures, vertical turbine pumping units, air chambers, electrical and SCADA systems, and water quality monitoring equipment. The project also involves selective demolition of existing structures, including the old pumping plant, and modifications to existing channels, such as replacing trash rakes and installing a fish barrier weir. The work requires full-time safety, quality control, and qualified survey personnel.

Contract Details

This was a Firm-Fixed Price (FFP) contract with an estimated magnitude of $50,000,000 to $80,000,000. The performance period is set from April 3, 2026, to October 20, 2028. The solicitation included specific Small Business Subcontracting Goals: 45.87% for Small Businesses, 5% for SDB, 5% for WOSB, 3% for HUBZone, 5% for SDVOSB, and 3% for ISBEE. Additionally, Indian Preference requirements for employment, training, and subcontracting were mandated. Wage Determinations for both heavy and building construction in San Juan County, NM, apply.

Evaluation & Key Clarifications

Proposals were evaluated on a Best Value basis, with non-price factors (Technical Approach, Staff Qualifications, Quality Control, Past Performance/Safety, SBP/Indian Preference Plan) combined being approximately equal in importance to Cost/Price. During the solicitation phase, multiple amendments and Q&A rounds clarified technical specifications, removed fish exclusion nets from the scope, added a new CLIN for conduit/conductors, and specified requirements for PLCs (Schneider Modicon M580) and motor controllers (soft starters for 900 HP motors, VFDs not allowed). The final proposal deadline was January 16, 2026.

Contact Information

For further information, contact Ashton Jones at ajones@usbr.gov or 801-524-3621.

People

Points of Contact

Jones, AshtonPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13Viewing
Award Notice
Posted: Apr 3, 2026
Version 12
Solicitation
Posted: Jan 13, 2026
View
Version 11
Solicitation
Posted: Dec 23, 2025
View
Version 10
Solicitation
Posted: Dec 19, 2025
View
Version 9
Solicitation
Posted: Nov 21, 2025
View
Version 8
Solicitation
Posted: Nov 12, 2025
View
Version 7
Solicitation
Posted: Oct 22, 2025
View
Version 6
Solicitation
Posted: Sep 29, 2025
View
Version 5
Solicitation
Posted: Sep 24, 2025
View
Version 4
Pre-Solicitation
Posted: Aug 27, 2025
View
Version 3
Pre-Solicitation
Posted: Aug 22, 2025
View
Version 2
Sources Sought
Posted: Jun 10, 2025
View
Version 1
Sources Sought
Posted: Jun 10, 2025
View