Y--Pre-Proposal Site Visit
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, National Park Service (NPS), through its DSC Contracting Services Division, has issued a Special Notice for a Pre-Proposal Site Visit concerning the upcoming Elbee Bend Bank Stabilization project. This project aims to protect critical archeological resources and infrastructure at the Knife River Indian Village National Historic Site in Mercer County, North Dakota. The full solicitation is anticipated to be advertised in early July 2026.
Project Details
The Elbee Bend Bank Stabilization project involves stabilizing approximately 1200 linear feet of the Knife River bank. This is crucial for protecting archeological resources, infrastructure such as County Road 37 and utility poles, and enhancing recreational opportunities. Erosion poses a significant threat to these assets.
Site Visit & Anticipated Solicitation
- Site Visit Date: June 17, 2026, at 0900 CST.
- Location: Knife River Indian Villages Visitor Center, Mercer County, North Dakota.
- Anticipated Solicitation Release: Early July 2026.
- NAICS Code: 237990 - Other Heavy and Civil Engineering Construction.
- Small Business Size Standard: $45M.
- Bonding Requirements: Bid, performance, and payment bonds will be required for the eventual contract.
- Period of Performance: Anticipated 356 calendar days, potentially including winter construction.
Project Conditions
The site presents specific challenges, including limited staging areas and difficult material delivery due to distance from suppliers. The park will remain open during construction, necessitating careful scheduling to minimize visitor impact. Protective measures will be required to ensure the surrounding area remains undisturbed.
Action Items
Interested parties planning to attend the site visit must RSVP to stormy.gallagher@ios.doi.gov and kristin.tauber@ios.doi.gov.
Contact Information
For inquiries, contact Stormy Gallagher at stormy_gallagher@nps.gov.