Y--Sources Sought YOSE Water & Sewer piping

SOL #: 140P2026R0083Special Notice

Overview

Buyer

Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Sewage And Waste Facilities (Y1ND)

Set Aside

No set aside specified

Timeline

1
Posted
May 21, 2026
2
Action Date
Jun 1, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, has issued a Sources Sought Notice for Water and Sewer Piping Replacement and Extension at Yosemite National Park, CA. This market research aims to identify qualified contractors for a project involving significant water distribution system upgrades and sewer line extensions. Responses are due June 1, 2026.

Scope of Work

The project involves two main components in the vicinity of the Big Oak Flat Entrance and Hodgdon Meadow Campground:

  • Water System Replacement: Includes construction of 1,200 LF raw water line, 7,900 LF water supply, 8,100 LF water distribution system, and related appurtenances serving the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing. This also entails demolishing an existing 100,000-gallon water storage tank and constructing a new 210,000-gallon tank with an access road, a new water source well and pump, a new water treatment and control building, 3,200 LF of electrical distribution, and 3,800 LF of communications service. Existing asbestos cement water main will be abandoned in place.
  • Sewer System Extension: Connection of the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground wastewater system, including approximately 3,500 LF of 6-inch sanitary sewer line, 20 sanitary sewer manholes, and 3 service laterals.

Contract & Timeline

  • Type: Sources Sought / Special Notice (Market Research)
  • Set-Aside: None specified (for market research to determine potential small business set-aside)
  • Response Due: June 1, 2026, by 3:00 PM MT
  • Published: May 21, 2026

Evaluation

Responses to the Sources Sought Survey Questionnaire (Attachment 1) will be used for market research to determine the appropriate solicitation method and any small business set-aside determination for Solicitation No. 140P2026R0083. The questionnaire requests information on company details, prime contractor experience (especially with water distribution, storage tanks, treatment, sewer, and utility infrastructure in sensitive/remote federal lands/National Parks), California licensing, bonding capacity, small business certifications, self-performance, and factors influencing proposal commitment.

Additional Notes

This notice is for planning purposes only and does not constitute a solicitation or guarantee a future award. Completing the survey is crucial for potential bidders to be considered in the market research and any small business set-aside decisions.

People

Points of Contact

Files

Files

Download
Download

Versions

Version 1Viewing
Special Notice
Posted: May 21, 2026
Y--Sources Sought YOSE Water & Sewer piping | GovScope