Y--Request for Proposal

SOL #: 140P2026R0008Solicitation

Overview

Buyer

Interior
National Park Service
DSC CONTRACTING SERVICES DIVISION
Denver, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Maintenance Buildings (Y1EB)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 25, 2026
2
Last Updated
May 12, 2026
3
Submission Deadline
May 22, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), a sub-tier of the Department of Interior, is soliciting proposals for construction services at Sunset Crater Volcano National Monument in Flagstaff, Arizona. This Total Small Business Set-Aside opportunity, titled "SUCR 333890 Address Contaminated Debris, Replace Maintenance Storage Facility, and Address Road Drainage Issues," seeks to address wildfire and flooding impacts. Proposals are due May 22, 2026, at 12:00 PM MDT.

Project Overview

This project involves three primary areas of work to mitigate the effects of wildfire and flooding: constructing a new maintenance storage facility, removing contaminated debris, and improving road drainage.

Scope of Work

The work is divided into four areas under a single prime contract:

  • Area 01 (Maintenance Storage Facility): Construction of a new warehouse building, concrete apron, and screened fence enclosure.
  • Area 02 (Contaminated Debris Field): Removal and cleanup of contaminated debris (e.g., Conex boxes with Antimony, Lead) in the existing storage yard.
  • Area 03 (Road Drainage - FR 545 Culvert): Removal and disposal of existing culvert/pavement, installation of new culvert pipes, and related earthwork/paving on FR 545 north of Bonito Meadow.
  • Area 04 (Road Drainage - Bonito Meadow Culvert): Similar culvert replacement and roadwork on FR 545 east of Bonito Meadow.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • Magnitude: Between $1,000,000 and $5,000,000
  • Period of Performance: June 1, 2026, to December 31, 2026. Performance must begin within 15 calendar days of Notice to Proceed (NTP) and be completed within 188 calendar days. Anticipated site work start is July 1, 2026.
  • NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45 million size standard.
  • Set-Aside: Total Small Business Set-Aside.
  • Bonds: Performance and Payment Bonds are required within 15 days after award.
  • Taxes: The project is not tax exempt; all Federal, State, and Local taxes must be included in proposals.

Submission & Evaluation

  • Proposal Due Date: May 22, 2026, at 12:00 PM MDT.
  • Questions Due: May 5, 2026.
  • Required Forms: Bidders must submit Project Experience, Past Performance Questionnaires (PPQs), and a Limitations on Subcontracting form. Previously submitted PPQs are acceptable.
  • Evaluation: Award will consider factors such as technical approach, schedule, management approach, project experience, key personnel experience, past performance, and price.
  • Subcontracting: For general construction, a maximum of 85% can be subcontracted to non-similarly situated subcontractors.

Key Requirements & Notes

  • Phasing: Project will be completed in three phases: Maintenance Storage Facility, Contaminated Debris Field removal, and Road Drainage/Culverts. Phase Three requires a FR 545 Road Closure from September 21, 2026, to October 21, 2026.
  • Environmental: Strict adherence to environmental regulations, including wildlife protection, waste management, and erosion control. A government-provided archeological monitor will be on-site during ground-disturbing activities.
  • Safety: An Accident Prevention Plan (APP) complying with OSHA and project requirements is mandatory. Follow ADOSH related programs.
  • Wage Rates: Prevailing wage rates for Building and Heavy construction in Coconino County, Arizona, are applicable.
  • Funding: This is currently an unfunded requirement with an expectation that funds will become available.
  • Registration: Vendors must be registered in SAM.gov.

Contact Information

For inquiries, contact James Waller at james_waller@nps.gov or 303-969-2488.

People

Points of Contact

Waller, JamesPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: May 12, 2026
Version 4
Solicitation
Posted: May 7, 2026
View
Version 3
Solicitation
Posted: Apr 30, 2026
View
Version 2
Solicitation
Posted: Apr 8, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 25, 2026
View
Y--Request for Proposal | GovScope