Y1DA--518-22-700 EHRM Infrastructure Upgrades Construction Bedford VAMC

SOL #: 36C77626R0003Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
PCAC (36C776)
INDEPENDENCE, OH, 44131, United States

Place of Performance

Be, MA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Hospitals And Infirmaries (Y1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Nov 18, 2025
2
Last Updated
Mar 31, 2026
3
Submission Deadline
Mar 31, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting proposals for the EHRM Infrastructure Upgrades Construction project (518-22-700) at the Bedford VA Medical Center (VAMC) in Bedford, MA. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for a Firm-Fixed-Price design-bid-build contract, estimated between $20 million and $50 million. The project involves comprehensive infrastructure modernization across numerous campus buildings. Proposals are due March 31, 2026, at 1:00 PM EST.

Scope of Work

This project entails extensive construction, alterations, and infrastructure upgrades to support Electronic Health Records Modernization (EHRM). Key elements include:

  • Comprehensive Recabling: Installation of new fiber optic and CAT 6a telecommunications cabling, Work Area Outlets (WAOs), racks, UPS, and associated electrical distribution across multiple buildings (e.g., Buildings 1-22, 33, 61, 62, 70, 78, 78A, 80, 81, 82, Crescent House).
  • New Construction: Phased replacement of the existing Main Computer Room (MCR) with a new building, including temporary and new fiber optic cabling.
  • System Installations: New Telecommunications Rooms (TRs), HVAC, CCTV, Fire Protection, Fire Alarm systems, Advanced Utility Monitoring System, and Physical Access Control Systems (PACS) with new doors.
  • Site Improvements: Site infrastructure upgrades, including concrete walkways and landscaping.
  • Hazardous Materials: Abatement of asbestos and lead-containing paint in some buildings.
  • Brand Name Integration: Specific brand-name systems are required for security cameras (Johnson Controls Exacqvision), PACS (Software House iStar), Building Management (Trane Ensemble), and Fire Alarm (Edwards EST3).

Contract Details & Requirements

  • Contract Type: Firm-Fixed-Price (Design-Bid-Build)
  • Period of Performance: Approximately 730 calendar days from Notice to Proceed.
  • Estimated Value: $20,000,000 to $50,000,000.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors must be SBA-certified and listed in the database.
  • NAICS Code: 236220 (Construction Of Hospitals And Infirmaries), Size Standard: $45.0 million.
  • Subcontracting: General Construction contractors must not pay more than 85% of the amount paid by the government to non-SDVOSB/VOSB firms.
  • Personnel: All personnel require VA PIV Cards. Superintendent, SSHO, and Quality Control Manager roles must be distinct.
  • Inspections: Comprehensive third-party inspections, testing, and written reports are required and paid for by the General Contractor. The VA will provide the Commissioning Agent.
  • Scheduling: Project schedules must be prepared using Oracle Primavera P6 Professional (Version 22+) or Microsoft Project Professional (Version 2021+).

Submission & Evaluation

  • Proposal Due: March 31, 2026, at 1:00 PM EST.
  • Submission Method: Electronic copies only, submitted via email in three separate volumes (Past Performance, Price, Administrative). Each volume must be a searchable PDF and under 5MB.
  • Evaluation Criteria: Tradeoff procedures under FAR Part 15. Past Performance is significantly more important than Price. At least one past performance project must exceed $20 million, with others demonstrating similar size, scope, and complexity.
  • Bonds: Electronic Bid Guarantee (20% of proposal price, max $3M) and Payment/Performance Bonds are required.
  • Questions: Technical questions cut-off was February 19, 2026. All questions must be submitted in writing to Dawn.Schydzik@va.gov.

Important Notes

This project is designed to be "stand alone" and will require simultaneous work across multiple buildings, with shutdowns limited to one at a time to minimize operational impact. Most work can be completed during normal business hours, but work impacting facility operations will require after-hours work.

People

Points of Contact

Dawn N SchydzikContract SpecialistPRIMARY
William D HenkelSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Solicitation
Posted: Mar 31, 2026
View
Version 8
Solicitation
Posted: Mar 26, 2026
View
Version 7
Solicitation
Posted: Mar 26, 2026
View
Version 6Viewing
Solicitation
Posted: Mar 17, 2026
Version 5
Solicitation
Posted: Mar 11, 2026
View
Version 4
Solicitation
Posted: Mar 10, 2026
View
Version 3
Solicitation
Posted: Feb 12, 2026
View
Version 2
Solicitation
Posted: Feb 2, 2026
View
Version 1
Pre-Solicitation
Posted: Nov 18, 2025
View