Y1DA--CON 668-21-100 Upgrade AHUs 18-20-22 Mechanical Systems

SOL #: 36C26026R0044Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
260-NETWORK CONTRACT OFFICE 20 (36C260)
VANCOUVER, WA, 98661, United States

Place of Performance

Spokane, Washington

NAICS

Plumbing (238220)

PSC

Construction Of Hospitals And Infirmaries (Y1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
Mar 24, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office (NCO) 20, anticipates issuing a solicitation for a Firm-Fixed-Price Construction Contract to upgrade Air Handling Units (AHUs) 18, 20, and 22 Mechanical Systems at the Mann-Grandstaff VA Medical Center in Spokane, WA. This project is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The solicitation is expected on or about April 03, 2026.

Scope of Work

The contractor will replace three existing AHUs with four new units (AHU 20 will be replaced by AHU 20A and 20K, with 20K dedicated to the 1st-floor kitchen). This includes the installation and replacement of associated electrical panel boards, breakers, cables, conduit, steam piping, chill water piping, and hydronic piping. The project also involves replacing ducts, trunks, and variable air volume (VAV) terminal boxes to create new zones and resize existing ones, and installing exhaust fans for proper air exchange. Demolition and commissioning services are required. The contractor must provide all supervision, labor, tools, materials, installation, programming, startup, training, O&M documentation, and a one-year warranty. Field verification of all equipment, parts, materials, and existing conditions is mandatory. An in-depth phasing plan is required to minimize impact on patient care, potentially involving varied work hours (after 1700 weekdays and weekends).

Contract Details

  • Contract Type: Firm-Fixed-Price Construction Contract
  • Estimated Magnitude: Between $5,000,000 and $10,000,000
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors)
  • Small Business Size Standard: $19 Million
  • PSC Code: Y1DA (Construction Of Hospitals And Infirmaries)
  • Period of Performance: 650 calendar days
  • Place of Performance: Mann-Grandstaff VA Medical Center, 4815 N Assembly Street, Spokane, WA 99205

Key Requirements & Performance Standards

The project demands adherence to detailed specifications covering demolition, abatement (asbestos, lead-based paint), structural work, exterior closure (roofing, insulation), interior finishes, and building systems (plumbing, HVAC, electrical). Key performance standards include:

  • Integration and programming of DDC upgrades, exhaust fans, and control systems with the existing Building Automation System (BAS).
  • Provision of a temporary air handler during AHU replacement if phasing requires.
  • Installation, maintenance, and removal of infection control barriers.
  • Full test and balance (TAB) for each new AHU, VAV, and associated equipment.
  • Operating tests in the presence of the Contracting Officer's Representative (COR).
  • Provision of commissioning documentation, demonstrations, and training to VA personnel.
  • Strict compliance with Federal, State, and Local regulations, quality control, and safety protocols.

Important Notes

This is a Presolicitation notice. The official solicitation, including specific submission instructions and evaluation criteria, is expected to be issued on or about April 03, 2026, via SAM.gov. Interested parties should review the attached draft Statement of Work, Specifications, and Drawings for comprehensive project details. No Government-Furnished Equipment (GFE) will be provided.

People

Points of Contact

Quyen MaiContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Pre-Solicitation
Posted: Mar 24, 2026
Version 2
Sources Sought
Posted: Jan 27, 2026
View
Version 1
Sources Sought
Posted: Jan 21, 2026
View
Y1DA--CON 668-21-100 Upgrade AHUs 18-20-22 Mechanical Systems | GovScope