Y1KA--Fort Logan National Cemetery Phase 1B Dam Spillway

SOL #: 36C10F25B0001Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)
WASHINGTON, DC, 20001, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Dams (Y1KA)

Set Aside

No set aside specified

Timeline

1
Posted
Aug 28, 2025
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Oct 15, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Office of Construction & Facilities Management, has awarded a $19,671,409.00 Firm Fixed-Price contract to IRON MIKE CONSTRUCTION LLC for the Fort Logan National Cemetery - Phase 1B - Dam/Spillway project. This award, made on April 1, 2026, was a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

Project Scope

This project involves comprehensive general construction, dam spillway modifications, alterations, roads, grading, drainage, utility systems, and water storage facilities at Fort Logan National Cemetery near Denver, Colorado. Key deliverables include:

  • NE Channel Improvements: Clearing, excavation, riprap channel, and retaining wall installation.
  • Denver Drive & Omaha Drive: Installation of box culverts, wingwalls, energy dissipator chute, and road rehabilitation.
  • Veterans Dam Rehabilitation: Tree removal, utility relocation, demolition of existing outlet/spillway, installation of new spillway, raising dam crest, and pump house repairs.
  • Memorial Dam Rehabilitation: Replacement of outlet gate, installation of stem wall/vent, demolition of existing spillway, installation of new spillway, and slope improvements. The contractor is responsible for obtaining all state/local construction permitting and conducting Protected Habitat Preservation, Wetlands, and Mitigation efforts.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Award Amount: $19,671,409.00
  • Award Date: April 1, 2026
  • Project Duration: 730 calendar days from Notice to Proceed.
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
  • Size Standard: $37 Million

Key Clarifications & Requirements

The solicitation, 36C10F25B0001, was evaluated based on PRICE ONLY – SEALED BID. Pre-proposal inquiries clarified several technical aspects:

  • All employees onsite require current OSHA 10 HR certification.
  • Structural concrete must be 4,500 PSI, with Type IL cement acceptable upon government approval. High velocity (HV) finish is required for water-exposed surfaces.
  • Waterstops are mandatory at all spillway joints; split bulb PVC waterstops are not permitted.
  • Pre-cast box culverts are allowed with proper water-tight gaskets and HV finish.
  • Site access is permitted from Denver Drive, with designated staging areas.
  • Superintendent, SSHO, and Quality Control Manager must be separate individuals directly employed by the prime contractor.
  • Bridge supplier pre-approval was not required prior to bid submittal, to be handled post-award.
  • Updated Wage Determinations for Denver County were provided through amendments.

Submission Context

Bids were due by January 14, 2026, at 2:00 PM EST, submitted electronically via email. A virtual bid opening was held on the same day.

People

Points of Contact

Rachel BeasonContracting OfficerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 8
Award Notice
Posted: Apr 1, 2026
View
Version 7
Solicitation
Posted: Jan 8, 2026
View
Version 6
Solicitation
Posted: Dec 9, 2025
View
Version 5
Solicitation
Posted: Nov 19, 2025
View
Version 4
Solicitation
Posted: Oct 9, 2025
View
Version 3
Solicitation
Posted: Sep 19, 2025
View
Version 2
Solicitation
Posted: Aug 28, 2025
View
Version 1Viewing
Solicitation
Posted: Aug 28, 2025