Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus

SOL #: 36C24826R0057Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
248-NETWORK CONTRACT OFFICE 8 (36C248)
TAMPA, FL, 33637, United States

Place of Performance

Orlando, Florida

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Mar 23, 2026
3
Submission Deadline
Mar 25, 2026, 5:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 8, is soliciting proposals for a Design-Build (DB) project to connect reclaim water at the Lake Baldwin Campus in Orlando, Florida. This Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside opportunity involves connecting the campus irrigation system to the City of Orlando's reclaim water main and paving an existing gravel parking lot. Proposals are due March 25, 2026, at 1:00 PM EST.

Scope of Work

The project is a Two-Phase Design-Build effort. Key requirements include:

  • Reclaim Water Connection: Design and install piping, fittings, valves, pumps, flow sensors, and electrical wiring to connect the campus irrigation system to the City of Orlando's reclaim water main. This includes determining the best route, conducting ground-penetrating radar surveys, and potentially installing a booster pump. The final connection location will be determined by the Design-Build engineer.
  • Parking Lot Paving: Pave the gravel lot southwest of Building 500 with asphalt, stripe it for parking spaces, and construct a new entry point. All work must comply with City of Orlando Engineering Standards, OUC, FDOT, and St. John's River Water Management District (SJRWMD) requirements.

Contract Details

  • Contract Type: Firm-Fixed-Price, Two-Phase Design-Build.
  • Magnitude: Between $500,000.00 and $1,000,000.00.
  • NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction).
  • Period of Performance: 661 calendar days after Notice to Proceed (347 days for design, 314 days for construction).
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).

Submission & Evaluation

  • Proposals Due: March 25, 2026, at 1:00 PM EST.
  • Submission Method: Via email to michael.zorzi@va.gov and aldwyn.singleton@va.gov. Proposals must be in PDF format, no larger than 7MB.
  • Evaluation: Phase One evaluates technical approach, technical qualifications, and past performance. A maximum of five offerors will be selected for Phase Two, which will involve detailed technical and price proposals.
  • Mandatory Attachments: Bidders must submit a detailed price breakdown (Attachment G), a Limitation of Subcontracting Certificate (Attachment F), Specialized Experience Form (Attachment D), and an EMR Form (Attachment C). Past Performance Questionnaires (Attachment E) are to be submitted directly by clients to the VA.
  • Acknowledgement: Offerors must acknowledge receipt of all amendments.

Important Notes

  • Funds are not presently available; award is subject to availability.
  • An Experience Modification Rate (EMR) greater than 1.0 will disqualify the contractor.
  • Bidders must adhere to the provided Wage Determination (Attachment B) for Orange County, Florida.

People

Points of Contact

Michael C ZorziContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Mar 23, 2026
View
Version 4Viewing
Solicitation
Posted: Mar 23, 2026
Version 3
Solicitation
Posted: Mar 16, 2026
View
Version 2
Solicitation
Posted: Mar 2, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 16, 2025
View