Yazoo Backwater Pumping Plant - Industry Day No. 1
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers (USACE) Vicksburg District is hosting an Industry Day for the Yazoo Backwater Pumping Plant project to gather industry input for design and acquisition planning. This event will inform three potential construction contracts: Inlet/Outlet Channel Excavation (up to $50M), Foundation & Site Development (up to $100M), and Pumping Plant Construction (over $1B). The Industry Day is scheduled for April 23, 2026, with written responses to questions due by April 21, 2026.
Purpose & Context
This Special Notice (W912EE26S0004) announces an Industry Day to engage qualified and capable contractors for the Yazoo Backwater Pumping Plant project. The USACE Vicksburg District seeks feedback to refine project designs and inform market research for future procurement planning. The project is in early design stages, and features are subject to change.
Project Scope
The Yazoo Backwater Pumping Plant (YBWPP) is a critical infrastructure project designed to manage water levels in the Yazoo Backwater Area. The current conceptual design (10% complete) outlines a 25,000 CFS pumping plant adjacent to the Steele Bayou Drainage Structure. Key components include:
- Inlet and Outlet Channel Excavation: Approximately 700,000 CY of excavation, with channels to be armored. Estimated magnitude up to $50M.
- Foundation & Site Development: Includes clearing, grubbing, temporary/permanent site access, staging areas, and establishment of borrow areas. Estimated magnitude up to $100M.
- Pumping Plant Construction: A pile-founded plant (approx. 200 ft x 500 ft) housing 14 x 1,800 CFS axial-flow pumps with 5000 HP electric motors, gearboxes, and a 75-ton overhead crane. Estimated magnitude over $1B. An 800 ft access bridge over the intake channel is also part of the project.
Acquisition Strategy & Industry Input
The USACE is exploring various acquisition approaches, including Single Award Task Order Contracts (SATOCs) for site preparation and channel excavation, and a two-phase strategy for the pumping plant construction (pre-qualification, Early Contractor Involvement with stipends, and a final competitive solicitation). Industry is specifically asked to provide input on:
- Self-performance vs. subcontracting strategies.
- Site logistics, including laydown areas, utilities, and security.
- Feasibility and requirements for river transport of materials.
- Efficient solutions for material delivery.
- Supply chain risks for specialty/long-lead items and mitigation strategies.
- Structuring work to accommodate incremental funding.
Industry Day Details & Participation
The Industry Day will be held on April 23, 2026, at 9:00 A.M. CST at the USACE Vicksburg District Headquarters (4155 Clay Street, Vicksburg MS 39180), with both in-person and virtual attendance options.
- Pre-registration: Complete the attached form and submit to Kasey.T.Davis@usace.army.mil by April 21, 2026.
- One-on-One Sessions: Prime contractors can request individual sessions from April 27 to May 01, 2026, to discuss project designs and procurement planning. Registration for these sessions is on a first-come, first-served basis and must be requested by April 23, 2026, via email to Kasey.T.Davis@usace.army.mil. These are not for general capability briefings.
- Written Responses: Firms are encouraged to submit written responses to the "List of Questions to Industry" by April 21, 2026, 2:00 PM CT, to Kasey.T.Davis@usace.army.mil and copy Ellis.Screws@usace.army.mil.
Key Dates
- Pre-registration Deadline (Industry Day): April 21, 2026
- Written Responses Due: April 21, 2026, 2:00 PM CT
- Industry Day Event: April 23, 2026, 9:00 A.M. CST
- One-on-One Session Registration Deadline: April 23, 2026
- One-on-One Sessions: April 27 - May 01, 2026
Additional Information
All interested firms must be registered and maintain an active registration in SAM.gov to be eligible for future contract awards.