Z--A250 Urgent Repairs to Pier 1

SOL #: 140P4326R0001Award Notice

Overview

Buyer

Interior
National Park Service
NER SERVICES MABO (43000)
BOSTON, MA, 02108, United States

Place of Performance

Charlestown

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Other Non Building Facilities (Z1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 26, 2026
2
Last Updated
Mar 31, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for Urgent Repairs to Pier 1 at the Boston National Historical Park, Charlestown Navy Yard, MA. This project involves critical structural and surface repairs to the pier, including concrete, steel, and an existing barge. This is a Total Small Business Set-Aside opportunity. The original proposal due date of February 26, 2026, was extended, but a new date is not specified in the provided amendments.

Scope of Work

The project encompasses comprehensive repairs to Pier 1, specifically:

  • Structural Repairs: Concrete-encased steel beams within three pier vaults, concrete delamination on the pier underdeck, and sinkholes within the pier deck (excavation depth not to exceed 10').
  • Material Specifications: Existing reinforcement must be retained, cleaned, and coated per ASTM780/A780M if section loss is not greater than 20%. All new steel hardware and fabrications require hot-dipped galvanization per ASTM A-123/A-153. Stainless Steel Welded Wire Fabric (WWF) is required for underdeck spall repairs, and Hot Dipped Galvanized (HDG) Hooked Rebar for other specific repairs.
  • Bollard & Gangway: Repairs to the connection between an aluminum gangway and the concrete deck platform, and replacement of two bollards (set 9' into the pier).
  • Barge Repairs: Repairs to the existing steel barge (Option 1).
  • Prohibited Methods: Shotcrete and drilling/cutting holes in the concrete deck for depositing concrete are not approved.
  • Operational Constraints: The pier must remain continuously accessible for NPS and Navy daily operations and special events.

Contract Details

  • Project Magnitude: Estimated between $1,000,000 and $5,000,000.
  • Contract Type: Firm-Fixed Price.
  • Period of Performance: March 16, 2026, to June 12, 2026.
  • Wage Rates: Federal Construction Wage Rates for Suffolk County, Massachusetts (MA20260008) apply.
  • Bonds: A bid guarantee of 20% of the bid price (or $3 million, whichever is less) is required. Performance and Payment Bonds for 100% of the original contract price are also mandatory.

Eligibility & Submission

  • Set-Aside: 100% Total Small Business Set-Aside (NAICS 237990, size standard $45M).
  • Evaluation: Proposals will be evaluated using a Best Value Continuum Tradeoff Process. Technical factors (Technical Approach, Project Experience, Management Experience) are equally important and, combined, are approximately equally important to price.
  • Registrations: Offerors must have a Unique Entity ID (UEI), be registered and active in SAM.gov, and have completed Online Representations and Certifications. Site access requires a TWIC card.
  • Site Visit: A site visit was held on February 12, 2026.
  • RFIs: All submitted Requests for Information (RFIs 1-29) have been addressed across Amendments 0001, 0002, and 0003.
  • Proposal Due: The original due date was February 26, 2026, at 11:00 AM EST. Amendment 0001 extended this date, but a new specific due date is not provided in the available documents. Offerors must acknowledge all amendments.

Point of Contact

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Award Notice
Posted: Mar 31, 2026
Version 5
Solicitation
Posted: Feb 27, 2026
View
Version 4
Solicitation
Posted: Feb 24, 2026
View
Version 3
Solicitation
Posted: Feb 23, 2026
View
Version 2
Solicitation
Posted: Feb 9, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 26, 2026
View
Z--A250 Urgent Repairs to Pier 1 | GovScope