Z--Crawford Dam Removal and Diversion - Zion NP

SOL #: 140P6426B0008Pre-Solicitation

Overview

Buyer

Interior
National Park Service
MWR OHIO(64000)
Macedonia, OH, 44067, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Dams (Z2KA)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Mar 31, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), Interior Regions 3/4/5, Ohio Major Acquisition Buying Office, has issued a Presolicitation Notice for the Crawford Dam Removal and Diversion project at Zion National Park in southwest Utah. This project is 100% set aside for Total Small Businesses. An Invitation for Bids (IFB) is expected to be issued in May 2026.

Project Scope

The work involves the partial removal and disposal of an existing concrete dam and headgate structure. Key tasks include:

  • Regrading approximately 300 feet of the North Fork Virgin River.
  • Constructing a new intake structure with a fish screen.
  • Removing and disposing of approximately 275 feet of existing CMP pipe and a concrete manhole.
  • Installing approximately 285 feet of 18-inch diameter ADS N-12 pipe (with 40 feet placed within 24-inch diameter CMP pipe).
  • Removing a concrete turnout box.
  • Reseating an existing 12-inch flume.
  • Installing approximately 150 feet of boulder embankment rip rap.
  • Option 1: Installation of approximately 350 feet of smart ditch.

Contract Details

  • Type: Firm-Fixed Price contract, expected to be an Invitation for Bids (IFB).
  • Project Magnitude: Between $1,000,000 and $5,000,000.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45 million size standard.
  • Set-Aside: 100% for Total Small Businesses.
  • Wage Rates: Construction Wage Rate Requirements for Washington County, UT will apply.

Key Dates & Information

  • Presolicitation Published: March 31, 2026.
  • Official Solicitation Release: Expected May 2026 on SAM.gov.
  • Expected Award: August 2026.
  • Performance Start: October 2026.
  • Sources Sought (Market Survey): A market survey was conducted, with responses due by March 18, 2026, to gauge contractor interest and capability.

Site Visit

A site visit date, time, and meeting location will be announced in the official solicitation. Offerors are highly encouraged to attend to understand the requirements and site conditions.

Registration Requirements

To be eligible for award, offerors must have a Unique Entity Identifier (UEI) number and be actively registered in the System for Award Management (SAM) at http://www.sam.gov. Online Representations and Certifications must be completed by the solicitation close date.

Point of Contact

Christopher Bauer, Contracting Officer, at christopher_bauer@ios.doi.gov or 330-468-2500 x5.

People

Points of Contact

Bauer, ChristopherPRIMARY

Files

Files

Download

Versions

Version 2Viewing
Pre-Solicitation
Posted: Mar 31, 2026
Version 1
Sources Sought
Posted: Mar 10, 2026
View
Z--Crawford Dam Removal and Diversion - Zion NP | GovScope