Z--GRPO - Mile Creek Stone Trail Bridge

SOL #: 140P6026B0005Solicitation

Overview

Buyer

Interior
National Park Service
MWR MIDWEST REGION(60000)
OMAHA, NE, 68102, United States

Place of Performance

Grand Portage, MN

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 27, 2026
2
Last Updated
May 28, 2026
3
Submission Deadline
Jun 29, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), an agency of the Department of the Interior, is soliciting bids for the GRPO - Mile Creek Stone Trail Bridge project at Grand Portage National Monument, Grand Portage, MN. This Total Small Business Set-Aside opportunity involves construction work to enhance pedestrian access and improve vehicular safety. The estimated magnitude is between $100,000 and $250,000. Bids are due June 29, 2026, at 10:00 AM CT.

Scope of Work

This project focuses on improving pedestrian access over the historic Mile Creek Stone Bridge and enhancing vehicular safety by removing abandoned roadway pavement. Key construction tasks include:

  • Sawcutting and removal of approximately 4,472 SF of existing asphalt pavement and aggregate subbase.
  • Milling of approximately 9,081 SF of existing asphalt (2" depth).
  • Removal of approximately 3,606 SF of aggregate shoulders.
  • Installation of approximately 100 CY of imported topsoil, 1,068 LF of silt fence, and 820 SY of erosion control blankets.
  • Installation of 9,081 SF of 2" depth asphalt overlay and 1,025 SF of 4" depth asphalt pavement wearing course.
  • Installation of 700 SF of 6" depth aggregate subbase and filter fabric.
  • Scarifying and recompacting subgrade at 6" depth.
  • Installation of 1 ABA accessible parking sign with bollard, 9 concrete wheel stops, and various pavement markings (706 LF lines, 1 ABA symbol, 9 letters). Updated drawings for these plans were issued via Amendment 0001 on May 28, 2026.

Contract Details

  • Contract Type: Firm-Fixed Price (Sealed Bid Invitation for Bid - IFB)
  • Period of Performance: 60 calendar days from the Notice to Proceed. Estimated start is late Summer/Fall 2026, specifically August 1, 2026, to October 1, 2026.
  • Estimated Magnitude: Between $100,000 and $250,000.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • NAICS Code: 237310 (Highway, Street, and Bridge Construction) with a $45 Million small business size standard.
  • Bonds: A bid guarantee of 20% (not to exceed $3M) is required, along with Performance and Payment bonds.
  • Wage Rates: Prevailing wage rates for Heavy and Highway Construction in Minnesota apply.
  • Compliance: Buy American requirements for construction materials.

Submission & Evaluation

  • Offer Due Date/Bid Opening: June 29, 2026, at 10:00 AM CT. The bid opening will be virtual.
  • Submission Method: Bids must be emailed in PDF format to bridget_parizek@ios.doi.gov.
  • Site Visit: An organized site visit is scheduled for June 11, 2026, at 10:00 AM CT at Grand Portage National Monument.
  • Questions Deadline: No later than 5 calendar days following the organized site visit.
  • Eligibility: Offerors must be registered in SAM.gov with an active status under the specified NAICS code.

Important Notes

The project involves a designated historic structure (Mile Creek Stone Bridge), requiring special precautions for the protection of historical and archeological fabric. Protection of existing utilities, landscaping, and surrounding structures is also mandatory. Construction will be restricted between August 3-9, 2026, due to a park scheduled event. Noise limitations, hazardous materials handling, and safety requirements (e.g., Accident Prevention Plan, PPE) are detailed in the specifications.

People

Points of Contact

Parizek, BridgetPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: May 28, 2026
Version 3
Solicitation
Posted: May 28, 2026
View
Version 2
Pre-Solicitation
Posted: May 5, 2026
View
Version 1
Sources Sought
Posted: Apr 27, 2026
View
Z--GRPO - Mile Creek Stone Trail Bridge | GovScope