Rehab Bear Valley School Foundation, NPS-PINN
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the rehabilitation of the Bear Valley School foundation at Pinnacles National Park, San Benito County, California. This project is a Total Small Business Set-Aside and involves constructing a new foundation for the historic schoolhouse. Proposals are due April 29, 2026, at 1500 local time.
Scope of Work
The project entails detaching the existing 800 sq ft wood-frame schoolhouse, temporarily supporting it, demolishing the current foundation, and constructing a new poured and reinforced stem wall foundation. Key deliverables include upgrading and reinforcing floor framing with metal tie-downs and re-securing the building onto the new foundation with anchor bolts. The contractor will provide all supervision, labor, equipment, testing, and supplies.
Contract Details
- Contract Type: Firm-fixed-price.
- Period of Performance: 120 calendar days after notice to proceed.
- Estimated Value: Affordability range of $500,000 - $725,000.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 238110 (Maintenance Of Restoration Of Real Property), with a size standard of $19 million.
Submission & Evaluation
- Proposal Submission Deadline: April 29, 2026, 1500 local time.
- Submission Method: Via email to alanna_gardner@ios.doi.gov.
- Evaluation Factors: Proposals will be evaluated based on Technical (Project Experience, Schedule, Contractor License, Safety) and Past Performance, weighted against Price.
- Site Visit: A site visit is scheduled for Monday, April 13, 2026, from 10:00 a.m. - 12:00 p.m. at Bear Valley School.
Additional Notes
Specifications and drawings are provided as Attachments 1 and 2, detailing architectural plans, structural notes, foundation layouts, and submittal requirements. Davis-Bacon Wage Rates (Attachment 3) apply. Offerors must be registered in the System for Award Management (SAM).