Z1DZ--520-26-109 Replace Fire Suppression Piping in Crawl Space, Biloxi (Emergency)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) has awarded a sole-source contract to Paramount Construction Group, LLC for the urgent replacement of fire suppression piping in the crawl space of Building 2 at the Gulf Coast Veterans Health Care System (GCVHCS) in Biloxi. The award, valued at $129,799.21, addresses an immediate safety concern. This was an SDVOSBC Set-Aside award.
Scope of Work
The awarded work involves the complete removal and replacement of fire suppression system piping in the crawlspace. Key tasks include:
- Temporary Repairs: Replacing/repairing approximately 10 linear feet of damaged 6" piping.
- Demolition: Removing all existing 6" fire suppression system piping, fittings, valves, and hangers.
- Installation: Furnishing and installing new 6" piping, fittings, three check valves, and one flow switch. This includes coordinating the new flow switch and check valves with the COR and integrating them into the facility alarms.
Contract & Timeline
- Type: Sole Source Award
- Value: $129,799.21
- Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
- Award Date: April 28, 2026
- Period of Performance: 30 calendar days from the Notice to Proceed.
- Published: April 29, 2026
Evaluation
This contract was awarded on a sole-source basis under the authority of "Unusual and Compelling Urgency." A competitive procurement was deemed not feasible due to the estimated 60-day delay it would incur, posing significant risks from ongoing damage. Paramount Construction Group (PCG) was selected due to their specialized expertise, prior experience at GCVHCS, and ability to mobilize quickly.
Additional Notes
Future requirements related to this issue are intended to be procured competitively. The contracting office is the Gulf Coast Veterans Health Care System, Network Contracting Office 16, Biloxi, MS. The Contracting Specialist is Tammy Tynes (Tammy.Tynes@va.gov, 228-523-5618).