Z2DA--570-20-308 - Replace and Expand Chilled Water Infrastructure in Building 1 | Construction Services Procurement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) Network 21 Contracting Office is issuing a Request for Proposal (RFP) for the Renovate and Expand Chilled Water Infrastructure project at the VA Central California Healthcare System in Fresno, California. This procurement is a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. The anticipated solicitation posting is May 25, 2026, with proposals due by June 29, 2026, at 10:00 AM Pacific Time.
Scope of Work
This project aims to replace undersized chilled water (CHW) infrastructure and associated mechanical systems in the main facility and Building 1 (OPC and Building 1 areas) at the Fresno VA Medical Center. The goal is to ensure adequate chilled water volume for operational needs.
Key elements include:
- Piping Replacement: Replacing existing undersized CHW piping and consolidating scattered risers.
- Pump & Fan Coil Replacement: Replacing existing CHW pumps and undersized fan coil units.
- Hot Water Integration: New piping will accommodate both hot and chilled water with control valves for seasonal switchover.
- Civil Work: Exterior routing of CHW lines, direct burial, jack-and-boring, and replacement of disturbed concrete, landscaping, and irrigation.
- Architectural Work: Installation of durable exterior envelope materials, new ceiling finishes, and new interior walls (including shaft walls for rated areas).
- MEP (Mechanical): Installation of new chill water pumps (10-hp and 25 HP) with automated controls, replacement of condensate risers, branch piping, duct-mounted coils, and chilled water coils. VAV terminal units are to remain.
- MEP (Electrical): Upgrading existing electrical infrastructure for new pumps, VFDs, control panels, and new fan coil units/controls.
- Fire Protection: Modification of the automatic wet-pipe sprinkler system to ensure complete coverage per NFPA 13 and VA FPDG.
Contract Details
- Procurement Type: Request for Proposal (RFP) under FAR Part 15
- NAICS Code: 236220 (Commercial and Institutional Building Construction)
- Size Standard: $45 Million
- Product Service Code: Z2DA (Repair Or Alteration Of Hospitals And Infirmaries)
- Set-Aside: Service-Disabled Veteran Owned Small Business (SDVOSBC)
- Period of Performance: 915 Calendar days after Notice to Proceed.
- Place of Performance: VA Central California Healthcare System, Fresno, CA.
Submission & Evaluation
- Anticipated Solicitation Posting: May 25, 2026
- Proposal Due Date: June 29, 2026, 10:00 AM Pacific Time
- Submission Method: Electronic medium only, in accordance with FAR 5.102(d).
- Inquiries: All contractual and technical questions must be submitted in writing via email to charee.harris@va.gov. No telephone inquiries will be accepted.
- Site Visit: A site visit will be scheduled, and the date will be posted with the RFP.
- Amendments: Offerors are responsible for continually monitoring the SAM.gov website for any amendments or postponements.
Special Requirements
- Infection Control: Strict adherence to Infection Control Risk Assessment (ICRA) Type D and E, and SMACNA guidelines is required due to work within an active hospital.
- Phasing: A detailed phasing plan is required to minimize downtime, with two weeks' notice to the COR for work in specific areas.
- Site Access & Parking: No on-site staging or contractor parking is provided.
- Safety: OSHA 10-hour training for workers, OSHA 30-hour for managers/superintendents, and a comprehensive safety plan are mandatory.
- Deliverables: Include Contractor Quality Control Plan (CQCP), Safety Plan, Submittals on CD, Laminated Drawings, Operations & Maintenance (O&M) training and manuals, and a minimum one-year warranty.
- Verification: Contractor must verify all amounts and conditions affecting work.