Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II

SOL #: 36C24126Q0173SolicitationSolicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
241-NETWORK CONTRACT OFFICE 01 (36C241)
TOGUS, ME, 04330, United States

Place of Performance

Leeds, MA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Utilities (Z2NZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Apr 2, 2026
3
Submission Deadline
Apr 15, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the NETWORK CONTRACT OFFICE 01 (36C241), is soliciting proposals for the Upgrade Steam Distribution System Phase II project (Project Number: 631-19-002) at the VA Central Western Massachusetts Healthcare System Edward P Boland Campus in Leeds, MA. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside opportunity, issued as a Task Order under the VISN 1 Construction MATOC. The project involves a comprehensive upgrade of the steam distribution system across multiple buildings. Proposals are due by April 15, 2026, at 1:00 PM EDT.

Scope of Work

This construction project entails the removal and upgrade of the steam distribution system in Buildings 1, 4, 5, 8, 9, 15, and 16 at the VAMC Central Western Massachusetts, 421 North Main Street, Leeds, MA 01053. The scope includes extensive site preparation, demolition, removal of existing structures, new construction, and furnishing all necessary labor and materials. Key aspects involve power distribution to new system components, integration with the existing campus Building Management System (BMS), and the safe removal of hazardous materials such as asbestos and lead paint. Technical divisions covered include existing conditions, concrete, wood, thermal and moisture protection, finishes, plumbing, HVAC, electrical, and communications.

Contract Details & Period of Performance

This solicitation is issued as a Task Order under the VISN 1 Construction MATOC, with an estimated value between $10,000,000 and $20,000,000. The contract is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside under NAICS Code 236220 (Repair Or Alteration Of Other Utilities). The period of performance is 730 calendar days from the Notice to Proceed, with mobilization required within 120 calendar days. Performance and Payment Bonds are required for awards exceeding $150,000, along with Bid Bonds/Bid Guarantee. A limitation on subcontracting of 85% applies for general construction.

Key Requirements & Standards

The project demands strict adherence to quality control (CQC Plan, USACE CQM certification for managers), safety (OSHA, EM 385-1-1, VA security, SSHO, AHAs, Hot Work Permits, ILSMs), and environmental controls (dust, infection, noise, waste management). A full-time MEPF Coordinator is required for system integration and clash resolution. Comprehensive commissioning of HVAC systems, including documentation, testing, and training for VA personnel, is mandatory. Specific personnel qualifications are required for Project Manager, Superintendent, CQC System Manager, MEPF Coordinator, and Site Safety and Health Officer. Procedures for asbestos abatement and lead-based paint removal are detailed.

Submission & Evaluation

Proposals are due April 15, 2026, at 1:00 PM EDT. Submissions must be made electronically through the Vendor Portal; hard copies or facsimiles will not be accepted. The evaluation factor is Price Only. Offerors must acknowledge all amendments, including Amendment 0001, and provide a signed offer, an itemized breakdown of costs using the provided template (S02_Base Offer Breakdown.xlsx), and a signed VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING. Offers must remain valid for at least 120 calendar days.

Contact Information

For inquiries, contact Brian Kelly, Contracting Officer, at Brian.Kelly@va.gov or 413-584-4040.

People

Points of Contact

Brian KellyContracting OfficerPRIMARY
NCO1 Construction Team 2SECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Apr 2, 2026
Version 1
Solicitation
Posted: Feb 23, 2026
View
Z2NZ--631-19-002 Upgrade Steam Distribution System Phase II | GovScope