127EAW26R0001 - Brush Creek Work Center Construction

SOL #: 127EAW26R0001Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States

Place of Performance

Berry Creek, CA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 27, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the Brush Creek Work Center Construction (Solicitation 127EAW26R0001) in Berry Creek, CA. This project, with an estimated magnitude of more than $10,000,000, involves decommissioning existing facilities and constructing a new work center. This opportunity is a Total Small Business Set-Aside. Proposals are due April 2, 2026, at 1:00 PM Pacific Time.

Scope of Work

The project requires the decommissioning of specified existing Plumas National Forest facilities and the comprehensive construction of a new work center, including all necessary utility infrastructure. Key construction elements include:

  • Demolition of existing structures and septic systems.
  • Construction of new facilities such as an engine garage, barracks, warehouse, storage containers, seeding cooler & canopy area, hazmat storage, pump house, and trash enclosure.
  • Installation of site utilities (water, sewer, electrical) and site improvements, including landscaping.
  • Several items are included as options, such as a landing zone hydrant, additional canopies, a trash enclosure, a hazmat storage container, and a seedling cooler unit, all confirmed as "adds."

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: 650 calendar days after the Notice to Proceed.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Project Magnitude: More than $10,000,000

Submission & Evaluation

Proposals must be submitted via email to Gregory.Cunningham@usda.gov by the due date. Required submission components include:

  • Completed SF1442
  • Price Proposal (using the latest "Schedule of Items - REVISION 002")
  • Project Schedule of Values
  • Technical Proposal
  • Bid Guarantee (20% of bid price or $1,000,000, whichever is less, for individual project amounts greater than $150,000). Evaluation factors include Past Performance (recency extended to 5 years), Work Plan/Technical Approach, Key Personnel, Performance Schedule, and Price. Award will be made to the responsible offeror whose proposal is determined to be best-valued.

Key Dates & Information

  • Proposal Due Date: April 2, 2026, 1:00 PM Pacific Time.
  • Site Visit: An organized site visit was held on February 25, 2026. Attendance was highly encouraged but not mandatory.
  • RFI Logs: Multiple RFI logs have been issued, with the latest dated March 27, 2026, providing crucial clarifications on page limitations (Factor 2: 10 pages, Factor 4: 3 pages), key personnel roles, environmental reports (Asbestos/Lead Paint, Geotechnical), and confirmation that ground-disturbing activities can occur year-round.
  • Eligibility: Offerors must possess a California General Contractors License Type B or equivalent from another state.
  • Liquidated Damages: $1,137.77 per calendar day for delay.
  • Contact: Greg Cunningham (gregory.cunningham@usda.gov).

People

Points of Contact

Greg CunninghamPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Solicitation
Posted: Mar 30, 2026
Version 6
Solicitation
Posted: Mar 27, 2026
View
Version 5
Solicitation
Posted: Mar 23, 2026
View
Version 4
Solicitation
Posted: Mar 11, 2026
View
Version 3
Solicitation
Posted: Feb 27, 2026
View
Version 2
Solicitation
Posted: Feb 17, 2026
View
Version 1
Solicitation
Posted: Jan 27, 2026
View
127EAW26R0001 - Brush Creek Work Center Construction | GovScope