30--DR PULLEY BUSH ASSY

SOL #: N0010425QYH95Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Speed Changer (333612)

PSC

Gears, Pulleys, Sprockets, And Transmission Chain (3020)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 3, 2026
2
Last Updated
May 20, 2026
3
Submission Deadline
May 8, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, is soliciting proposals for DR PULLEY BUSH ASSY (NSN 3HD 3020 016877256 SQ). This requirement is a 100% Total Small Business Set-Aside for the manufacture and supply of 30 units of the AN/BRA-24 Toughmet Drive Pulley & Bushing Assembly for Navy submarines. Proposals are due by May 8, 2026.

Scope of Work

This solicitation is for the manufacture and supply of 30 DR PULLEY BUSH ASSY (NSN 3HD 3020 016877256 SQ), specifically the AN/BRA-24 Toughmet Drive Pulley & Bushing Assembly. Key requirements include:

  • Manufacturing from specified materials: CU-NI-SN Alloy, TOUGHMET 3, and K-Monel.
  • Adherence to marking requirements per MIL-STD-130.
  • Strict Mercury Free requirements for all supplied materials, intended for use on submarines/surface ships.
  • Compliance with detailed design, manufacturing, and quality assurance specifications outlined in the solicitation.

Contract & Timeline

  • Type: Solicitation (Request for Quotation - RFQ)
  • Set-Aside: Total Small Business (100%)
  • Quantity: 30 units
  • Proposal Due: May 8, 2026
  • Published: May 7, 2026

Evaluation

Award will be made to the responsible offeror whose quotation provides the best value to the Government, considering both price and non-price factors. Non-price factors, when combined, are approximately equal to price. Key evaluation factors include:

  • Price
  • Non-Price Factors
  • Delivery Lead Time: Proposals with delivery lead times considered in the best interest of the Government will be rated higher.
  • Past Performance: Evaluation will assess successful performance, quality, timeliness, cost management, communications, proactive management, and customer satisfaction on related contracts.

Key Requirements & Quality Assurance

Offerors must adhere to stringent quality requirements, including:

  • First Article Testing/Inspection: Supplier testing/inspection is required, with Government approval needed for the procedure prior to commencement and for the report prior to production.
  • Quality Inspection System: Must be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012.
  • CDRLs: Submission and Government approval are required for the Quality Inspection and Test Plan, First Article Testing/Inspection Procedure, First Article Testing/Inspection Report, and Production Lot Testing/Inspection Report.
  • Objective Quality Evidence Records (OQEDs): Required for raw material and finished parts, traceable by drawing/item/part, heat, lot, serial, and contract number.

Contact: Jessica T. Grzywna at JESSICA.T.GRZYWNA.CIV@US.NAVY.MIL or 215-697-5095.

People

Points of Contact

JESSICA.T.GRZYWNA.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View
View
View
View
Download
Download
View

Versions

Version 9
Solicitation
Posted: May 20, 2026
View
Version 8Viewing
Solicitation
Posted: May 7, 2026
Version 7
Solicitation
Posted: May 7, 2026
View
Version 6
Solicitation
Posted: May 6, 2026
View
Version 5
Solicitation
Posted: May 5, 2026
View
Version 4
Solicitation
Posted: May 4, 2026
View
Version 3
Pre-Solicitation
Posted: May 4, 2026
View
Version 2
Solicitation
Posted: Mar 3, 2026
View
Version 1
Solicitation
Posted: Mar 3, 2026
View