30--DR PULLEY BUSH ASSY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support Mech is soliciting proposals for the manufacture and supply of 30 DR PULLEY BUSH ASSY (NSN 3HD 3020 016877256 SQ). This requirement is a Total Small Business Set-Aside and will result in an award to the offeror providing the best value, considering both price and non-price factors. Proposals are due by July 17, 2026.
Scope of Work
This procurement covers the manufacture and quality requirements for the AN/BRA-24 Toughmet Drive Pulley & Bushing Assembly for use on Navy submarines. Key aspects include:
- Manufacturing from specified materials (CU-NI-SN Alloy, K-Monel).
- Marking requirements per MIL-STD-130.
- Strict mercury-free specifications for all materials.
Contract & Timeline
- Type: Request for Quotation (RFQ)
- Set-Aside: Total Small Business
- Response Due: July 17, 2026, 20:30 UTC
- Published: May 20, 2026
- Agency: NAVSUP Weapon Systems Support Mech
Evaluation
Award will be based on a best value determination, evaluating both price and non-price factors. Non-price factors, when combined, are approximately equal to price and include:
- Delivery Lead Time: Proposed schedules will be evaluated, with shorter lead times rated higher.
- Past Performance: Assessment of successful performance, quality, timeliness, cost management, and customer satisfaction on related contracts.
Key Requirements
- Quality System: Supplier's Quality Inspection System must comply with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012.
- First Article Testing: Required, with procedures and reports subject to Government approval by NSWCPD prior to commencement of production.
- Documentation (CDRLs): Submission of Quality Inspection & Test Plan, First Article Testing/Inspection Procedure and Report, Production Lot Testing/Inspection Report, Certified Mill Certification, Certificate of Compliance for Materials, Visual/Dimensional Inspection Reports, and Mercury Exclusion Certification.
- Configuration Control: Adherence to MIL-STD-973 or EIA-649.
- Final Inspection: Conducted by the cognizant DCMA-QAR, with NSWCPD surveillance as needed.
Contact Information
For inquiries, contact Jessica T. Grzywna at JESSICA.T.GRZYWNA.CIV@US.NAVY.MIL or 215-697-5095.