59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support is soliciting proposals for the repair and modification of Circuit Card Assemblies (P/N NV823311-1 and NV823311-2). This is a Total Small Business Set-Aside opportunity, with proposals due by April 7, 2026. The resultant award will be a bilaterally issued contract, and it is a DO certified order under the Defense Priorities and Allocations System (DPAS).
Scope of Work
This contract requires the repair and modification of specific Circuit Card Assemblies (CAGE 73030, Ref. No. NV823311-1 and NV823311-2). Repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. Key requirements include:
- Marking: Physical identification in accordance with MIL-STD-130.
- Design Changes: Specific procedures for changes in design, material, servicing, or part numbers, requiring Contracting Officer approval.
- Electrostatic Discharge Control: Compliance with ANSI/ESD S20.20.
- Mercury Free: Material must be free from metallic mercury and contamination, intended for use on submarines/surface ships. Written approval is required for any functional inclusion of metallic mercury.
Contract & Timeline
- Type: Solicitation (Contract to be issued bilaterally)
- Set-Aside: Total Small Business
- Product Service Code: 5998 (Electrical And Electronic Assemblies; Boards, Cards, And Associated Hardware)
- Response Due: April 7, 2026, 8:30 PM EST
- Published: March 18, 2026
- Option: Includes an option for increased quantity, exercisable 365 days after award. Pricing for this option is requested.
Evaluation
Award will be based on best value to the Government, with price as a secondary evaluation factor, inclusive of the option provision.
Additional Notes
Offerors who are not the Original Equipment Manufacturer (OEM) must state the OEM's company name and CAGE, and provide a signed letter of authorization as a distributor on the OEM's letterhead. Consideration for award will only be given to authorized distributors of the original manufacturer's item. The contractor is responsible for all inspection requirements and must maintain records for 365 days after final delivery. Packaging shall be in accordance with MIL-STD 2073.