61--CONTROLLER,HOIST
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, has issued a Presolicitation for 15 units of Controller, Hoist (NSN 7H-6110-014798425-D4). This action is intended as a sole-source procurement under FAR 6.302-1. However, all responsible sources are invited to identify their interest and capability. Responses will be considered if received within 45 days of the opportunity's publication date (May 7, 2026).
Scope of Work
This requirement is for a Controller, Hoist, designated as SPECIAL EMPHASIS material due to its critical role in shipboard systems. Key specifications include:
- Manufactured per Hydracon Drawing 1810-100 and PL1810-100.
- Cable length: 240 inches (20 feet) total, including the switch.
- Connector plug bodies treated with Non-Conductive Coating (NCC) plasma spray per NAVSEA S9320-AM-PRO-030/MLDG.
- Cable assembly wired and molded per NAVSEA S9320-AM-PRO-020/MLDG, Volume II.
- Quality Conformance Tests required per MIL-DTL-24231 Type 1, with specific exceptions.
- Non-metallic materials must meet toxicity and flammability requirements.
- Hazardous material identification and Material Safety Data Sheets are required.
- Packaging and marking must comply with MIL-STD-2073. The items are to be delivered to N50286, Portsmouth Naval Shipyard L1SS, Kittery, ME 03904.
Contract Details
- Type: Presolicitation (intended sole-source under FAR 6.302-1).
- Set-Aside: None specified.
- Contract Type: Expected to be issued as "EAF" (Expedited Acquisition Framework).
- Delivery: Required within 210 days.
- Inspection & Acceptance: At Origin.
Submission & Evaluation
The Government intends to solicit and negotiate with only one source. However, all responsible sources may identify their interest and capability to respond. This notice is not a request for competitive proposals. Proposals, quotations, or capability statements received within 45 days of the opportunity's publication date (May 7, 2026) will be considered. A determination not to compete is solely at the Government's discretion. Submission of all certification data CDRLs is required 20 days prior to delivery, with PNSY review/acceptance 6 working days after receipt. The DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file.
Timeline
- Published Date: May 7, 2026
- Response Window: Within 45 days of publication (approximately June 21, 2026).
Contact Information
For inquiries, contact NOELLE M. SMITH at (717)605-3992 or NOELLE.M.SMITH10.CIV@US.NAVY.MIL.