ALF Heavy and Normal Maintenance on the Rocky Gap ATV Trail system
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service, Allegheny National Forest is soliciting quotations for Heavy and Normal Maintenance services on the Rocky Gap ATV Trail system in Warren, PA. This acquisition is a Total Small Business Set-Aside for trail maintenance, with a response deadline of April 3, 2026, at 1700 CT.
Scope of Work
The contractor will provide all labor, supervision, equipment, and materials necessary for comprehensive trail maintenance. Key services include:
- Normal and heavy tread maintenance (for ruts up to 18 inches deep)
- Seeding, mulching, and silt fencing
- Riprap (R-3) installation
- Litter and trash collection/disposal
- Vegetation cutting and removal, under brushing
- Erosion control and ditch cleaning All work must maintain a trail width of 50 inches or less. Equipment must be thoroughly cleaned to prevent invasive species introduction. Detailed technical specifications are provided in Attachment 6 and performance measures in Attachment 4.
Contract Details
- Contract Type: Firm Fixed-Price Purchase Order
- Set-Aside: Total Small Business Set-Aside (NAICS 237990, Size Standard $45,000,000)
- Period of Performance: April 3, 2026, to June 30, 2026, with a target completion date of May 21, 2026.
- Place of Performance: Allegheny National Forest, Rocky Gap ATV Trail system, Warren, PA.
- Wage Determination: Federal wage rates (Attachment 7) apply.
Submission & Evaluation
Quotations are due by April 3, 2026, 1700 CT. Award will be based on the highest technically rated quotation with fair and reasonable pricing and acceptable or neutral past performance. Evaluation factors include:
- Past Performance/Related Experience
- Equipment
- Personnel Required submission documents include SF-1449, a Schedule of Items with pricing, and a completed Experience Questionnaire (Attachment 8).
Key Updates & Actions
- Amendment 0002 updated the Period of Performance and included new Q&A.
- Amendment 0001 revised estimated material quantities, amended the Statement of Work, and added Attachment 9 (Site Specific Breakdown of Materials and Compaction Rates), which is crucial for accurate bidding. All aggregate will be limestone.
- Site visits are highly encouraged and can be arranged by contacting Kelsey Meacham (kelsey.meacham@usda.gov).
- For general inquiries, contact Michael Simpson (michael.simpson@usda.gov).