ANF FR154 Bridge Replacement
SOL #: 12445526B0005Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States
Place of Performance
PA
NAICS
Highway (237310)
PSC
Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 5, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
Apr 7, 2026, 5:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting bids for the ANF FR154 Bridge Replacement project in Warren County, PA. This Total Small Business Set-Aside opportunity requires the demolition of the existing bridge and the procurement and installation of a new one. Bids are due April 7, 2026, at 1:00 PM Eastern.
Scope of Work
This project involves the complete replacement of the Farnsworth Bridge (FR 154-5.445) over Farnsworth Run in the Allegheny National Forest. The scope includes:
- Demolition and disposal of the existing single-span steel, two-girder bridge.
- Procurement and installation of a new 61-foot overall length, single-span, side-by-side prestressed concrete box beam bridge with concrete abutments and CIP pile foundations.
- All work must adhere to the "Standard Specification for Roads and Bridge on Federal Highway Projects FP-14" and the "Forest Service Supplemental Specifications to the FP-14 (FSSS)".
- The new bridge will be 18.625 feet wide with a 17.25 feet clear roadway width, bearing elevation 1 foot higher than existing.
- In-stream work has seasonal restrictions (October 1 – January 1, and February 15 – June 1).
Contract Details
- Type: Invitation for Bid (IFB) leading to a Firm Fixed Price (FFP) contract.
- Estimated Magnitude: Between $500,000 and $1,000,000.
- Set-Aside: Total Small Business Set-Aside (NAICS 237310, size standard $45M).
- Performance Period: Completion required no later than September 30, 2026.
- Applicable Wage Rates: Davis-Bacon Act prevailing wages for Heavy and Highway Construction Projects in Pennsylvania apply.
Submission & Evaluation
- Offers Due: April 7, 2026, at 1:00 PM Eastern.
- Submission Method: Via email to debra.brinn@usda.gov.
- Required Documents: Complete bid including Attachment 02 Schedule of Items (all items priced) and acknowledgement of any amendments.
- Bid Bond: Required for bids exceeding $150,000.00 (SF-24, $155,000 or 20% of total bid).
- Evaluation: Award will be made to the lowest priced, responsible offeror who is responsive to the solicitation.
- Bid Hold Period: Offerors must hold prices firm for 90 calendar days.
- Site Visit: Urged and expected for offerors to inspect the work site.
Key Clarifications & Notes
- The correct bid due date is April 7, 2026, at 1:00 PM Eastern, resolving previous discrepancies.
- There is no separate Project Manual; bidders must refer to FP-14 and FSSS specifications.
- The completion date of September 30, 2026, is firm, though the government may consider adjustments if there are delays in award execution.
- An operation plan must be submitted within 10 days after award, and a quality control system implemented.
People
Points of Contact
BRINN, DEBRA KPRIMARY
Files
Versions
Version 8
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
Version 7
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 13, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 5, 2026