ANF FR154 Bridge Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting bids for the ANF FR154 Bridge Replacement project in Warren County, PA. This Total Small Business Set-Aside opportunity requires the demolition and disposal of the existing bridge, followed by the procurement and installation of a new 56-foot single-span box beam bridge. The estimated magnitude is between $500,000 and $1,000,000. Bids are due April 7, 2026, at 1:00 PM Eastern.
Scope of Work
The project involves the complete replacement of the Farnsworth Bridge on Forest Road 154. This includes:
- Demolition and disposal of the existing 1934 steel girder bridge.
- Procurement and installation of a new 56-foot clear span, single-lane, side-by-side prestressed concrete box beam bridge (61-foot overall span).
- Work must adhere to designs and specifications outlined in the Federal Highway Projects FP-14 and Forest Service Supplemental Specifications (FSSS). There is no separate Project Manual.
- Specific technical details include a required 0.375-inch wall thickness for 14-inch pipe piles; taper tubes are not acceptable for cast-in-place piles.
Contract Details
- Solicitation Number: 12445526B0005
- Type: Invitation for Bid (IFB), Firm Fixed Price (FFP)
- Set-Aside: Total Small Business Set-Aside (NAICS 237310, size standard $45M)
- Estimated Magnitude: $500,000 - $1,000,000
- Performance Period: Completion required by September 30, 2026. The government will consider delays if the award is significantly delayed.
- Location: Allegheny National Forest, Warren County, PA.
- Prevailing Wages: Davis-Bacon Act prevailing wages apply for Heavy and Highway Construction in Pennsylvania.
Submission & Evaluation
- Bid Due Date: April 7, 2026, at 1:00 PM Eastern.
- Submission Method: Email offers to debra.brinn@usda.gov.
- Required Documents: Complete Attachment 02 Schedule of Items (all items priced) and acknowledge amendments.
- Bid Bond: Required for bids exceeding $150,000. Must be on Standard Form 24 (SF-24) for $155,000 or 20% of the total bid. Surety must be certified via Treasury Circular 570.
- Evaluation: Award will be made to the lowest priced, responsible, and responsive offeror. Offerors must hold prices firm for 90 calendar days.
- Site Visit: Urged for all offerors.
- Questions: Must be submitted via email to debra.brinn@usda.gov at least 3 business days prior to the closing date.
Additional Notes
The Forest Service will complete required tree removal by March 31. In-stream work has seasonal restrictions (October 1 – January 1, and February 15 – June 1). A detour is planned, and the bridge and adjacent roadway will be closed during construction. An operation plan and quality control system are required post-award.