B1610 and 2310 Boiler Replacement

SOL #: FA489726Q0008Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 6, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 6, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the B1610 and 2310 Boiler Replacement project at Mountain Home Air Force Base (MHAFB), ID. This Total Small Business Set-Aside opportunity involves the dismantling and replacement of boilers in two buildings. The estimated value is $25,000 to $100,000. A mandatory site visit is scheduled for April 20, 2026, at 10:00 AM MDT, with registration required by April 15, 2026. Offers are due by May 6, 2026, at 4:00 PM Z.

Scope of Work

This project requires the furnishing and installation of two new, fully integrated, and functional boilers to replace existing units in Building 2310 (Lochinvar KnightXL KBX-1000N-M13 or equal) and Building 1610 (Lochinvar KnightXL KBX-0400N or equal). Key requirements include:

  • Meeting specific salient characteristics: 7" touchscreen, 97% thermal efficiency, flow switch, condensate trap neutralizer, 10:1 turndown modulating burner.
  • Connecting new boilers to existing electrical, water, and gas lines.
  • Isolating, removing, and disposing of existing boilers.
  • Installing new appliance regulators, condensate neutralizer kits, and BACnet (over IP) cards.
  • Re-establishing existing Exhaust Combustion System (ECS) capability and installing exhaust/intake ducts.
  • Installing supply/return isolation valves, tee connections, and wye strainers.
  • Performing minor modifications to existing lines and insulating new piping.
  • Conducting boiler start-up with a manufacturer-certified technician and submitting performance sheets.
  • Installing an outdoor sensor and programming boilers for specific set-points and outdoor reset schedules.
  • All work must comply with Mountain Home AFB Temporary Environmental Controls (section 01 57 19).

Contract & Timeline

  • Contract Type: Firm Fixed Price Solicitation
  • NAICS Code: 238220 (Plumbing and Air-Conditioning Contractors)
  • Size Standard: $19,000,000.00 Annual receipts
  • Estimated Value: $25,000 to $100,000
  • Period of Performance: 90 Calendar Days from Notice to Proceed. Boiler replacement to be coordinated for late spring, summer, or early fall 2026, with installation and functioning by October 2, 2026. Service interruptions are not allowed during cold weather months.
  • Site Visit: April 20, 2026, 10:00 AM MDT. Registration required by April 15, 2026, 12:00 PM MDT.
  • Questions Due: Within three business days from the site visit.
  • Offers Due: May 6, 2026, 4:00 PM Z.

Eligibility & Evaluation

  • Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
  • Evaluation Criteria: Proposals will be evaluated based on Price and Technical capabilities/experience. Technical capabilities will be an important consideration, allowing for a higher-priced offer if supported by superior technical merit.
  • Wage Rates: Bidders must adhere to prevailing wage rates for building construction in Idaho, as outlined in General Decision Number ID20260020 (Davis-Bacon Act).

Special Requirements

Contractor personnel must be able to read, write, speak, and understand English, obtain base identification and vehicle passes, and wear/display identification. A pre-construction meeting is required, and Operation and Maintenance Manuals for all installed equipment must be provided.

Contact Information

People

Points of Contact

Gage BergmanPRIMARY
SrA Deivid BaezSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 7, 2026
View
Version 5
Solicitation
Posted: May 6, 2026
View
Version 4
Solicitation
Posted: Apr 27, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 25, 2026
Version 2
Solicitation
Posted: Apr 20, 2026
View
Version 1
Solicitation
Posted: Apr 6, 2026
View