Z--BISO MAINT TO BANDY CREEK WATER TANK
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), Big South Fork National River and Recreation Area, is soliciting proposals for cyclic maintenance of the 75,000-gallon steel potable water storage tank at Bandy Creek Campground, Oneida, TN. This is a 100% Total Small Business Set-Aside procurement. The work aims to restore protective coatings, correct deficiencies, and extend the tank's operational life. Proposals are due May 22, 2026, at 5:00 PM EDT.
Scope of Work
The contractor shall provide all labor, materials, equipment, and incidentals for comprehensive tank maintenance. Key tasks include:
- Draining, isolation, and removal/disposal of accumulated sediment.
- Interior and exterior cleaning, surface preparation (including abrasive blasting per SSPC-SP10 / NACE No. 2 for interior), and corrosion removal.
- Application of interior potable water coatings (NSF/ANSI 61) and exterior protective coatings (AWWA D102).
- Minor hardware replacement, vent screen repair, and tank disinfection.
- Installation of a remote tank level monitoring and SCADA telemetry system. Work must comply with industry standards (AWWA D102, C652, SSPC, NACE, NSF/ANSI 61) and regulatory requirements (OSHA, EPA, TDEC). A minimum five-year coating warranty is required.
Contract & Timeline
- Contract Type: Firm Fixed Price (FFP) Construction.
- Set-Aside: 100% Total Small Business Set-Aside.
- NAICS: 237110 Water and Sewer Line and Related Structures Construction ($45M size standard).
- Period of Performance: 90 calendar days from Notice to Proceed (NTP).
- Site Visit: May 12, 2026, at 11:00 AM EDT at Bandy Creek Campground.
- Questions Cut-off: May 13, 2026, 1:00 PM EDT.
- Proposal Due: May 22, 2026, 5:00 PM EDT.
Evaluation Criteria
Award will be based on Lowest Price Technically Acceptable (LPTA). Technical acceptability is evaluated on a Pass/Fail basis across five factors:
- Relevant Experience: Two completed projects within 5 years (steel water tank maintenance, coating, surface prep, confined space).
- Key Subcontractors and Personnel: Qualified personnel for coating inspection, confined space, fall protection, coating application, SCADA/telemetry.
- SOW/Specification Compliance: Adherence to all technical requirements.
- Period of Performance: Agreement to complete within 90 days.
- Technical Approach: Brief approach (1-2 pages) covering surface prep, coating, containment, QC, and SCADA. Past performance and price reasonableness will also be evaluated.
Special Requirements
Offerors must be registered in SAM.gov. Performance and payment bonds are required. Compliance with the Department of Labor Wage Determination (TN20260120) for Scott County, TN, is mandatory. Pre-construction submittals (work plan, safety plans, environmental plan, QC plan, coating procedures) are required before work commencement. Coordination with NPS and strict adherence to safety, environmental, and BISO food storage guidelines are essential.