Z--BISO MAINT TO BANDY CREEK WATER TANK

SOL #: 140P5326R0016Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Oneida, TN

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 21, 2026
2
Last Updated
May 21, 2026
3
Submission Deadline
May 29, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS) is soliciting proposals for cyclic maintenance of the Bandy Creek potable water storage tank located at the Big South Fork National River and Recreation Area in Oneida, TN. This is a Firm Fixed Price, 100% Small Business Set-Aside procurement. The project aims to restore protective coatings, correct deficiencies, and extend the operational life of the tank, which supports potable water service to the Bandy Creek Campground and associated park facilities. Proposals are due May 29, 2026, at 5 PM EDT.

Scope of Work

The contractor shall provide all labor, materials, equipment, and incidentals for the cyclic maintenance of the 75,000-gallon steel potable water storage tank. Key tasks include:

  • Tank draining and isolation
  • Removal and disposal of accumulated sediment
  • Interior and exterior cleaning and surface preparation
  • Application of interior potable water coatings and exterior protective coatings
  • Minor hardware repairs and tank disinfection
  • Return of the tank to service

An optional task for the installation of a remote tank level monitoring and SCADA telemetry system may be exercised at the Government's discretion. Clarifications indicate that exterior surface preparation (SSPC-SP6) applies only to localized areas, not full abrasive blasting, and the project is cyclic maintenance, not full-strip rehabilitation.

Key Requirements

Work must comply with applicable industry standards including AWWA D102, AWWA C652, SSPC-SP1, SSPC-SP10, SSPC-PA2, NACE No.2, NSF/ANSI 61, OSHA, EPA, and Tennessee Department of Environment and Conservation regulations. A minimum five-year warranty for all coatings is required. Pre-construction submittals, including work plans, safety plans (site-specific, confined space, fall protection), environmental protection plans, waste handling plans, and quality control plans, are mandatory. Prevailing wage rates, as per DOL Wage Determination TN20260120 for Scott County, TN, apply.

Contract Details

  • Contract Type: Firm Fixed Price Construction
  • Set-Aside: 100% Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237110 Water and Sewer Line and Related Structures Construction ($45M size standard)
  • Period of Performance: June 1, 2026, to September 30, 2026 (no more than 90 calendar days from Notice to Proceed)
  • Place of Performance: Bandy Creek Campground, 145 Campground Road, Oneida, TN 37841

Submission & Evaluation

  • Proposal Due Date: May 29, 2026, at 5 PM EDT
  • Submission Method: Email all proposals to Ashley_Warcewicz@ios.doi.gov
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA). Technical acceptability is evaluated on a Pass/Fail basis, requiring completion of a specific Technical Acceptability Template. Factors include relevant experience (two projects in the last five years), key subcontractors/personnel, SOW/specification compliance, period of performance, and technical approach.
  • Site Visit: A site visit was held on May 12, 2026, at 11:00 AM EDT.
  • Registration: Offerors must be registered in SAM.gov prior to award. Performance and payment bonds are required.

Amendments & Clarifications

Multiple amendments have been issued. Amendment 3 posted the most recent tank inspection report (May 13, 2026) and additional Q&A, confirming the proposal due date of May 29, 2026, and the Period of Performance from June 1, 2026, to September 30, 2026. Earlier amendments extended the due date, revised the SOW, and provided detailed clarifications on surface preparation, coating systems, and the optional SCADA system.

People

Points of Contact

Warcewicz, AshleyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 21, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View