Bldg 128 Freezer Door Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the Bldg 128 Freezer Door Replacement project at Camp Lejeune, NC. This opportunity is a Total Small Business Set-Aside and is restricted to specific M&R MACC Contractors listed on the General Requirements cover page. The project involves replacing a freezer door to ensure an airtight seal and maintain the integrity of the refrigerated space. Proposals are due April 2, 2026, at 2:00 PM EST.
Scope of Work
The project requires the removal of the existing freezer door, jambs, headers, and threshold, followed by the repair of walls, floor, and ceiling. A new 72" x 61-1/2" panel, 4-inch thick freezer door with insulation, outside and inside diamond plate finish, and specific hardware (self-closing, spring-loaded hinges, cylinder lock, safety-release handle) must be installed. The new door must include anti-condensing strip heaters, a waterproof thermometer, and resilient gaskets compliant with NSF/ANSI standards. Strip curtains are also required. Compliance with ASTM E84, NSF ANSI 2 & 7, and UL 207 & 723 is mandatory.
Special Requirements
Contractors must arrange access and scheduling through the Contracting Officer's Representative and the building tenant (Terry Castleberry, 910-451-6270). Field measurements are the contractor's responsibility. Disposal of asbestos-containing materials and lead-painted building products must be done at the Camp Lejeune sanitary landfill by appointment, with all other contractor-generated material weighed at the base landfill. A written permit and fire watch are required for "hot work." Required submittals include shop drawings, installation drawings, product data, a 10-year commercial limited warranty, and as-built drawings in AutoCAD and Adobe PDF. The fabricator and installer must have a minimum of three years documented experience, and the installer must be certified by the door manufacturer.
Contract Details
This is a Combined Synopsis/Solicitation with an estimated cost range of $25,000 to $100,000. The contract completion time is 180 days after award, with liquidated damages set at $220 per calendar day. Proposals less than $40,000 require no bonds; proposals $40,000 and greater require a payment bond; and proposals $150,000 and greater require a bid bond, payment bond, and performance bond.
Eligibility & Submission
This solicitation is restricted to the following M&R MACC Contractors: T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction. Proposals must be submitted via email to NAVFAC_ML_ROICCCampLejeune-Bids1@navy.mil AND benjamin.a.bryan.civ@us.navy.mil by April 2, 2026, at 2:00 PM EST. The proposal acceptance period is 60 days from receipt of offers.
Evaluation
Award will be based on the Lowest Price, considering compliance with the Buy American statute requirements.
Key Dates & Actions
A site visit was held on Tuesday, March 10, 2026, at 9:00 AM at Bldg 128. Requests for Information (RFIs) were due by March 25, 2026, 3:00 PM EST. Amendment 0001, posted March 26, 2026, provided answers to RFIs regarding door details and reminds bidders to acknowledge its receipt with their proposal.
Important Documents
Bidders should review the Contractor Environmental Guide for Camp Lejeune, Combined DIV 01 specifications for administrative and procedural requirements, and the Submittal Register for required documentation. The MAXIMO Initial Equipment Inventory form provides details on existing equipment.