BLDG 722 Electrical Installation - April 2026

SOL #: W911RX26QA024Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT RILEY
FORT RILEY, KS, 66442-0248, United States

Place of Performance

Fort Riley, KS

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 6, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, MICC-FT RILEY, is soliciting quotes for a BLDG 722 Electrical Installation at Fort Riley, Kansas. This Total Small Business Set-Aside opportunity involves a one-time electrical upgrade to support the Synthetic Training Environment-Reconfigurable Virtual Collective Trainer-Air (STE-RVCT-A) suite. The solicitation is a Request for Quote (RFQ) under FAR Part 13. Offers are due by April 6, 2026.

Scope of Work

The project requires the installation of electrical upgrades in Building 722, 722 Ray Road, Fort Riley, Kansas. Key requirements include:

  • Installation of one (1) 300 Amp Electrical Panel, replacing an old amperage panel. The contractor is responsible for powering this new panel.
  • Installation of thirteen (13) dedicated 20 Amp electrical outlets, to be placed on pre-existing grid railing at 14 feet high.
  • Provision and installation of thirteen (13) 25-foot cord reels, one for each outlet, with a required gauge for 20 Amps at up to 96% load (SO cord acceptable).
  • Provision and installation of approximately 150 feet of conduit and electrical wiring.
  • All electrical work must comply with NFPA 70E, NEC 70, NEC 70B, and applicable Army Regulations. The power requirement is 60 hertz single phase, with raceway running through drop ceilings.

Contract Details

  • Contract Type: Firm Fixed Price Service Contract (RFQ under FAR Part 13).
  • Period of Performance: A one-time upgrade to be completed within 7 business days, scheduled between April 10, 2026, and April 30, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19.8 million.

Submission & Evaluation

  • Offer Due Date: April 6, 2026, at 04:00 PM local time.
  • Submission: Offerors must fill out and sign both the 'Solicitation - W911RX26QA024' and the 'Attachment 01 Salient Characteristics Sheet'. These documents, along with any other relevant quote documents, must be emailed to the Point of Contact. The Salient Characteristics Sheet is critical for demonstrating compliance with technical requirements.
  • Evaluation Factors: Award will be based on Minimum Technical Acceptability and Price, with the government awarding to the responsible Offeror whose offer is most advantageous.

Special Requirements & Notes

  • Site Visit: A non-mandatory site visit is planned for March 31, 2026, at Building 722, Fort Riley, KS. A maximum of two representatives per Offeror are permitted, and no pictures are allowed. Information provided during the site visit is unofficial.
  • Security: Contractor personnel require local background checks, AT Level I, and iWATCH training. Information Assurance Technician (IAT) Level I certification is mandatory for employees.
  • Compliance: Contractors must maintain a Quality Control Program (QCP), use E-Verify for employment eligibility, and comply with insurance requirements (Worker's Comp, General Liability, Auto Liability). Invoicing will be via Wide Area Work Flow (WAWF).
  • Drawings: 'BLDG 722 Drawings' and 'Elec Install Site Pictures' are available to aid in understanding the scope.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Mar 30, 2026
View
Version 5Viewing
Solicitation
Posted: Mar 30, 2026
Version 4
Solicitation
Posted: Mar 27, 2026
View
Version 3
Solicitation
Posted: Mar 26, 2026
View
Version 2
Solicitation
Posted: Mar 25, 2026
View
Version 1
Solicitation
Posted: Mar 24, 2026
View